Head of Procurement: assortment straight off SAP
Merchandising wants Ward. You sign the contract. Ward spots assortment movement in your SAP data and accounts for what caused it.
How a Head of Procurement runs assortment off SAP Retail
Merchandising wants Ward. You sign the contract. Ward filters to what a Head of Procurement can act on and drops the rest.
Assortment Planning, in one sentence. Ward analyzes sell-through by store cluster to recommend which SKUs to add, drop, or reallocate.
The mechanism. Ward clusters stores by demographic, traffic, and sales patterns, then measures SKU performance against cluster benchmarks.
Setup: Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.
What you get
- Planogram optimization inputs
- Store cluster segmentation
- SKU rationalization recommendations
- Whitespace opportunity detection
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.
| Signal | Finding |
|---|---|
labor_efficiency | Rev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak |
inventory.fresh | Fresh fill 83%, backroom replenishment lag at 2–4p |
promo.lift | BOGO crackers cannibalized Brand Y by 28%, net category +6% |
Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.
labor_scheduling…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
sap_pos_transactions | import | 2m ago |
sap_inventory_shrinkage | import | 2m ago |
sap_labor_scheduling | import | 14m ago |
retail_inventory_weekly | import | 1h ago |
retail_google_ads_daily | import | 1h ago |
retail_meta_ads_daily | import | 1h ago |
retail_ga4_website_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
finance-read-shrinkage | permit | Model::"inventory_shrinkage" |
vendor-blocked | forbid | Model::"labor_*" |
region-west-only | permit | Tenant::"acme" |
Why this combination
is its own problem.
Assortment Planning produces a lot of output that is technically correct and operationally useless to procurement. Ward filters on whether the finding changes a decision a Head of Procurement can actually make.
What Ward has eyes on.
The assortment model runs on a daily cycle, not on a reporting calendar. It detects the pattern, accounts for the driver, and attaches what to do about it before the number reaches a review deck.
The connection to SAP Retail is read-only and runs on your schedule. Ward reads POS transactions, inventory positions, and the rest of the feed, then stitches together it with external context your ERP does not carry: weather, local events, competitor pricing.
What the first 90 days
actually look like.
-
01
Week 1: connect
Read-only credentials to SAP Retail. Ward reads straight from POS transactions, inventory positions, purchase orders and starts building baselines. First daily cards land inside 48 hours, before baselines are stable, so you can see the shape of the output early.
-
02
Weeks 2 to 3: baselines
Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the findings are directionally right and the thresholds are still moving.
-
03
Weeks 4 to 12: operating rhythm
Insight cards arrive on a daily cycle and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.
How Ward connects to SAP Retail
Ward connects to SAP Retail (S/4HANA, ECC, CAR) via standard BAPIs and IDocs. Transaction data, inventory positions, and master data flow into Ward without custom development.
Setup: Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.
Data Ward reads from SAP
Impact metrics with SAP
Data lake enrichment
Ward enriches SAP data with: POS transactions, Weather & events, Competitor pricing, Loyalty & CRM, Supplier fill rates
Merchandising wants Ward. You sign the contract.
- ×Business sponsor saw the demo. You have a week to vet a vendor you didn't pick
- ×AI vendors price by seats and tokens. Total cost is unknowable until invoice three
- ×Multi-year commits with auto-renew. No exit if the pilot stalls
- ×Renewals come back 30% higher, with no room to push back and no benchmark to cite
- ×Security and DPA reviews start after the team has already committed
- ✓MSA, DPA, SOC 2 Type II underway, and architecture review available before signature
- ✓Month-to-month contracts. No multi-year lock-in. No auto-renew traps
- ✓Transparent pricing set by scope and store count
- ✓14-day insight guarantee. If Ward doesn't deliver, month two is on us
- ✓AI strategy, orchestration and reporting-layer work in enterprise grocery at nine-figure revenue. Reference calls available before signature
Enterprise SaaS spend grew 18% YoY. 53% of subscriptions are underused or duplicative. Source: Gartner
Frequently asked questions
Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule. Data points include: POS transactions, Inventory positions, Purchase orders, Material master, Vendor master, Promotion calendar.
Merchandising wants Ward. You sign the contract. Ward solves this with automated insight cards: MSA, DPA, SOC 2 Type II underway, and architecture review available before signature. Month-to-month contracts. No multi-year lock-in. No auto-renew traps. Transparent pricing set by scope and store count.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what assortment problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.