Fill Rate · Looker

Run fill rate straight off Looker

Every empty shelf is a lost sale. Ward runs it directly off your Looker feed, read-only, with no changes to your BI.

Fill Rate Monitoring on Looker / Looker Studio data

Fill Rate Monitoring is a card type Ward runs continuously. Ward monitors on-shelf availability across your entire estate and flags stores or categories dropping below threshold.

What Ward does with that: Ward tracks expected vs actual on-shelf availability at the store-category level and escalates when fill rate drops below configurable thresholds.

The connection itself. Ward can query Looker via API or connect directly to the underlying database. Either way, Ward monitors while your team browses.

The short list

  • Threshold-based alerting
  • Store-vs-estate benchmarking
  • Category-level drill-down
  • Estate-wide fill rate dashboard
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Fill Rate on Looker data, live product demo.

Why this combination
is its own problem.

Most fill rate projects stall at data access. This one does not, because Looker already exposes looker API for query results, underlying database (direct), lookML model metadata through an API Ward reads directly.

What Ward has eyes on.

The fill rate model runs each day, not on a reporting calendar. It spots the pattern, explains what caused it, and attaches the next step before the number reaches a review deck.

Ward pulls from looker API for query results, underlying database (direct), lookML model metadata from Looker / Looker Studio on a read-only connection. Nothing is written back, and your BI configuration does not change. Looker stays the system of record.

What the first 90 days
actually look like.

  1. 01

    Week 1: read-only connection

    Ward plugs into Looker / Looker Studio with read-only credentials and begins ingesting looker API for query results and underlying database (direct). No config changes on your side. First cards arrive inside the first 48 hours.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the daily cards are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: operating rhythm

    Cards arrive daily and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to Looker / Looker Studio

Ward does not replace Looker. Ward watches the same data Looker visualizes and proactively alerts when something changes. Your dashboards stay. Ward adds intelligence.

Setup: Ward can query Looker via API or connect directly to the underlying database. Either way, Ward monitors while your team browses.

Data Ward reads from Looker

Looker API for query results
Underlying database (direct)
LookML model metadata

Impact metrics with Looker

Time to Insight
Proactive, no login
Explains why metrics moved before anyone checks a dashboard.
Anomaly Detection
Inter-refresh coverage
Catches deviations between Looker dashboard refresh cycles.
Decision Velocity
Root cause attached
Every anomaly card includes cause analysis; no drill-down needed.
Data Utilization
Unused models activated
LookML dimensions and measures queried beyond built dashboards.

Data lake enrichment

Ward enriches Looker data with: Looker query results, Underlying database, Weather & events, Competitor data, Customer segments

Frequently asked questions

Ward can query Looker via API or connect directly to the underlying database. Either way, Ward monitors while your team browses. Data points include: Looker API for query results, Underlying database (direct), LookML model metadata.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what fill rate problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info