Ward and BigQuery for Furniture supply chain
Ward reads Google BigQuery and returns furniture cards scoped to supply chain. You find out about stockouts after customers do.
What a furniture VP Supply Chain gets from Google BigQuery
A Furniture Manufacturing & Retail operator is continuous review 10,000+ SKUs throughout locations. ERP-locked production data, long lead times, and margin erosion you don't see until quarter-end. Ward connects your internal systems and surfaces what matters.
You find out about stockouts after customers do. Ward delivers insight cards scoped to supply chain decision-making.
Getting the data in. Service account with BigQuery Data Viewer role. Ward runs read-only SQL queries on your schedule.
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled upholstery cost of goods by BOM line against the last price file. Three quarters of the drop is material and freight, not discounting.
| Signal | Finding |
|---|---|
bom_cost_actuals | Foam and frame stock +9.2% since the March price file, never carried to list |
freight.inbound | Inbound container cost +$412 per unit-equivalent on the Vietnam lane |
channel.mix | Wholesale share up 6pp, and wholesale runs 11pp under DTC margin |
Recommend: reprice the six affected SKUs at the next list cycle, quote the alternate foam vendor, and hold wholesale allocation flat until list catches up.
bom_cost_actuals…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
epicor_production_stage_log | import | 2m ago |
epicor_bom_cost_actuals | import | 2m ago |
sap_inventory_snapshot | import | 14m ago |
netsuite_sales_orders | import | 1h ago |
retail_showroom_pos | import | 1h ago |
retail_freight_inbound | import | 1h ago |
retail_dealer_orders | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
finance-read-default | permit | Model::* |
sourcing-read-bom | permit | Model::"bom_cost_actuals" |
dealer-blocked | forbid | Model::"bom_*" |
plant-read-production | permit | Model::"production_stage_log" |
What Ward delivers
- Stockout prediction cards arrive 24-72 hours before empty shelves
- Supplier fill rate tracking with automatic escalation
- Dynamic safety stock recommendations based on current demand signals
- Weather, event, and macro-driven demand adjustments
- Replenishment exceptions auto-prioritized by revenue impact
Metrics Ward monitors
Furniture challenges Ward solves
- Disconnected ERP, warehouse, and POS systems
- Custom/configurable SKUs that break standard reporting
- 8–16 week lead times with no demand signal
- Raw material cost drift invisible until P&L close
- Channel mix shift between showroom, e-commerce, and wholesale
What Ward has eyes on.
Every one of your locations gets its own baseline. Ward monitors inventory carrying cost, order-to-delivery cycle, gross margin by channel against it and raises only the deviations that hold up. The two that show up most in furniture retail are disconnected ERP, warehouse, and POS systems and custom/configurable SKUs that break standard reporting, and both are baseline problems before they are P&L problems.
Ward reads BigQuery rather than replacing it. Any BigQuery dataset, gA4 event exports, ads data transfers come across on a read-only connection, get enriched with contextual data, and come back as daily cards. Your Data Platform is untouched.
Why this combination
is its own problem.
A VP Supply Chain rarely logs into BigQuery. They read what someone else pulled out of it, two days later. Ward removes the two days and the someone else.
What the first 90 days
actually look like.
-
01
Week 1: read-only connection
Ward sits on top of Google BigQuery with read-only credentials and begins ingesting any BigQuery dataset and gA4 event exports. No config changes on your side. First cards arrive in two days.
-
02
Weeks 2 to 3: baselines
Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the insight cards are directionally right and the thresholds are still moving.
-
03
Weeks 4 to 12: operating rhythm
Insight cards arrive daily and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.
How Ward connects to Google BigQuery
Ward queries BigQuery using your existing datasets. GA4 exports, POS data, CRM exports. Ward reads it where it lives.
Setup: Service account with BigQuery Data Viewer role. Ward runs read-only SQL queries on your schedule.
Data Ward reads from BigQuery
Impact metrics with BigQuery
Data lake enrichment
Ward enriches BigQuery data with: Any BigQuery dataset, GA4 event exports, Weather & events, Demographics, Custom feeds
You find out about stockouts after customers do.
- ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
- ×Supplier fill rate problems announce themselves at the receiving dock
- ×Safety stock levels get set once a year and left alone
- ×No early warning system for supply chain disruptions
- ×Replenishment exceptions require manual triage every morning
- ✓Stockout prediction cards arrive 24-72 hours before empty shelves
- ✓Supplier fill rate tracking with automatic escalation
- ✓Dynamic safety stock recommendations based on current demand signals
- ✓Weather, event, and macro-driven demand adjustments
- ✓Replenishment exceptions auto-prioritized by revenue impact
Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group
Furniture KPI impact
Frequently asked questions
Service account with BigQuery Data Viewer role. Ward runs read-only SQL queries on your schedule. Data points include: Any BigQuery dataset, GA4 event exports, Ads data transfers, Custom ETL outputs.
Yes. Ward reads BigQuery data and combines it with contextual signals (weather, events, demographics) to generate Furniture-specific insight cards. No custom development required.
You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.
Ward delivers daily insight cards covering Inventory carrying cost, Order-to-delivery cycle, Gross margin by channel, tailored for Supply Chain decision-making. Each card includes what changed, why it matters, and what to do next.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what Furniture problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.