Grocery · Demand · SAP · VP Merchandising

Demand Forecasting for Grocery on SAP, built for merchandising

See demand before it arrives. Ward runs it on SAP data over your grocery store base, scoped to merchandising.

How a grocery VP Merchandising runs demand on SAP Retail

Grocery & Supermarket changes the scale of the problem: 30,000+ SKUs, every one of your stores. Fresh availability, shrinkage, and promo effectiveness across hundreds of stores. Ward monitors perishable turn rates and flags waste before it happens.

Your category managers are drowning in spreadsheets. Ward writes the finding at the altitude a VP Merchandising works at.

Here is demand forecasting in plain terms. Ward combines historical patterns, weather data, local events, and economic signals to forecast demand at the store-SKU-day level.

What Ward does with that: Ward builds store-level demand models incorporating seasonality, weather forecasts, promotional calendars, local events, and macroeconomic indicators.

The connection itself. Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.

Key capabilities

  • Store-SKU-day level precision
  • Weather-driven adjustment
  • Event and holiday modeling
  • Automatic reorder point recalculation
app.getward.ai Live demo
Acme Grocery @Merchandising: Fresh Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin, center store
22.6%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
relex_replenishment_planimport1h ago
blue_yonder_forecast_dailyimport1h ago
retail_fresh_waste_dailyimport1h ago
retail_promo_calendarimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
lp-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
fresh-team-westpermitModel::"fresh_waste_daily"
Demand for Grocery on SAP data, live product demo.

Why Demand matters for Grocery retail

Perishable inventory creates an asymmetric cost function, over-ordering causes waste, under-ordering causes stockouts, both within a 48-72 hour window. Ward builds store-SKU-day models incorporating hyperlocal weather, community events, and holiday patterns to tighten the ordering window beyond what weekly aggregates can deliver.

What Ward has eyes on.

Ward ingests SAP rather than replacing it. POS transactions, inventory positions, purchase orders come across on a read-only connection, get enriched with contextual data, and come back as cards. Your ERP is untouched.

See demand before it arrives. Ward runs the model continuously rather than on a reporting cycle, which is why a finding lands the morning the pattern starts instead of at the end of the period.

Ward monitors 30,000+ SKUs across your stores, at the store-category level rather than the chain roll-up. The metrics under watch include fill rate, shrinkage %, fresh waste %. A roll-up hides a single-store problem inside a healthy average, which is how fresh waste & spoilage stays invisible for a quarter.

At the metric level. Precision depends on perishable turn-rate modeling, weather-demand correlation by category, promotional lift isolation, and event demand pattern libraries. Ward measures forecast accuracy at WMAPE by department and flags when accuracy degrades below threshold.

Signals · Two years of POS by store-SKU-day, current and historical promos, hyperlocal weather, school district calendars, local event feeds, and demographic overlays per store.

Why this combination
is its own problem.

Most demand projects stall at data access. This one does not, because SAP already exposes POS transactions, inventory positions, purchase orders through an API Ward reads directly.

  • 01 Holiday calendars are set at the chain level; floating holidays (Easter, Ramadan, Lunar New Year) shift demand by 20-40% in affected stores but barely move the chain forecast.
  • 02 New-item launches use a category-average curve when in reality the lift profile differs by ethnic mix and pricing tier.

Benchmarks. Healthy grocery WMAPE runs 18-25% at the store-SKU-week grain and 28-40% at store-SKU-day. Fresh departments are noisier (35-55%). A 5-point WMAPE improvement on top-200 SKUs typically saves 0.5-1.2% of fresh COGS in shrink.

What the first 90 days
actually look like.

  1. 01

    Week 1: connect

    Read-only credentials to SAP Retail. Ward ingests POS transactions, inventory positions, purchase orders and starts building baselines. First cards land inside 48 hours, before baselines are stable, so you can see the shape of the output early.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the findings are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: operating rhythm

    Insight cards arrive each day and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to SAP Retail

Ward connects to SAP Retail (S/4HANA, ECC, CAR) via standard BAPIs and IDocs. Transaction data, inventory positions, and master data flow into Ward without custom development.

Setup: Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.

Data Ward reads from SAP

POS transactions
Inventory positions
Purchase orders
Material master
Vendor master
Promotion calendar

Impact metrics with SAP

Replenishment Accuracy
Gaps flagged early
Inventory positions matched to POS velocity before shelf impact.
Shrinkage
Anomalies surfaced continuously
Transaction-level detection catches what periodic audits miss.
Forecast Accuracy
External signals layered
Weather, events, and competitor data sharpen SAP demand signals.
Promo ROI
True lift isolated
Sell-through data exposes cannibalization and halo effects.

Data lake enrichment

Ward enriches SAP data with: POS transactions, Weather & events, Competitor pricing, Loyalty & CRM, Supplier fill rates

Your category managers are drowning in spreadsheets.

Pain points
  • ×Promo planning still runs off last year's playbook
  • ×Assortment reviews happen quarterly when they should happen daily
  • ×Price changes chase the market a week behind it
  • ×No visibility into true cannibalization across categories
  • ×Vendor negotiations lack real-time sell-through evidence
How Ward helps
  • Insight cards flag promo cannibalization the day it happens
  • Assortment gaps and whitespace opportunities surface automatically
  • Price elasticity shifts detected before margin erosion compounds
  • Category-level performance cards replace manual spreadsheet reviews
  • Vendor scorecards generated from actual fill rate and quality data

Retailers lose an estimated $300B+ annually to suboptimal assortment and promotional decisions. Source: McKinsey & Company

Grocery KPI impact

Shrinkage
Cause-level attribution
Loss prevention shifts from guesswork to targeted intervention.
Fill Rate
24–72hr head start
Stockout prediction cards arrive before customers notice gaps.
Fresh Waste
Flagged before spoilage
Perishable turn rates monitored by store.
Promo ROI
Net lift, not gross
True lift net of cannibalization and pull-forward.

Frequently asked questions

Ward combines historical patterns, weather data, local events, and economic signals to forecast demand at the store-SKU-day level. For Grocery retail specifically, Ward monitors 30,000+ SKUs across your stores and delivers automated insight cards with root cause analysis and recommended actions.

Ward tracks Fill rate, Shrinkage %, Fresh waste %, Promo lift, Basket size at the store-category level. Ward builds store-level demand models incorporating seasonality, weather forecasts, promotional calendars, local events, and macroeconomic indicators.

Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule. Data points include: POS transactions, Inventory positions, Purchase orders, Material master, Vendor master, Promotion calendar.

Yes. Ward reads SAP data and combines it with contextual signals (weather, events, demographics) to generate Grocery-specific insight cards. No custom development required.

Your category managers are drowning in spreadsheets. Ward solves this with automated insight cards: Insight cards flag promo cannibalization the day it happens. Assortment gaps and whitespace opportunities surface automatically. Price elasticity shifts detected before margin erosion compounds.

Ward delivers daily insight cards covering Fill rate, Shrinkage %, Fresh waste %, tailored for Merchandising decision-making. Each card includes what changed, why it matters, and what to do next.

Precision depends on perishable turn-rate modeling, weather-demand correlation by category, promotional lift isolation, and event demand pattern libraries. Ward measures forecast accuracy at WMAPE by department and flags when accuracy degrades below threshold.

Ward detects a hurricane tracking toward your Florida market five days out and maps the predictable surge sequence: water and batteries first, then canned goods and bread, then cleanup supplies post-event. Ward issues phased demand adjustment cards store by store based on distance from projected landfall, avoiding both panic stockouts and post-storm overstock write-offs.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what Grocery demand problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info