Grocery · Fill Rate · SAP · VP Supply Chain

Fill Rate Monitoring: Grocery retail, SAP data, Supply Chain decisions

Ward pulls from POS transactions, inventory positions, purchase orders from SAP Retail, tracks fill rate throughout 30,000+ grocery SKUs, and hands back the supply chain read on a daily cycle.

How a grocery VP Supply Chain runs fill rate on SAP Retail

You find out about stockouts after customers do. Ward filters to what a VP Supply Chain can act on and drops the rest.

Fill Rate Monitoring. Ward monitors on-shelf availability across your entire estate and flags stores or categories dropping below threshold.

A Grocery & Supermarket operator is continuous review 30,000+ SKUs throughout stores. Fresh availability, shrinkage, and promo effectiveness across hundreds of stores. Ward monitors perishable turn rates and flags waste before it happens.

How it runs. Ward tracks expected vs actual on-shelf availability at the store-category level and escalates when fill rate drops below configurable thresholds.

Setup: Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.

What you get

  • Estate-wide fill rate dashboard
  • Threshold-based alerting
  • Store-vs-estate benchmarking
  • Category-level drill-down
app.getward.ai Live demo
Acme Grocery @Merchandising: Fresh Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin, center store
22.6%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
relex_replenishment_planimport1h ago
blue_yonder_forecast_dailyimport1h ago
retail_fresh_waste_dailyimport1h ago
retail_promo_calendarimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
lp-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
fresh-team-westpermitModel::"fresh_waste_daily"
Fill Rate for Grocery on SAP data, live product demo.

Why Fill Rate matters for Grocery retail

Estate-wide fill rate averages mask critical variation, a chain at 94% overall can have dozens of stores hemorrhaging revenue below 88%. Ward monitors fill rate at the store-category-hour level, because a produce section that empties by 4 PM is a fundamentally different problem than one consistently understocked.

What Ward has eyes on.

The fill rate model runs every morning, not on a reporting calendar. It picks up the pattern, accounts for the cause, and attaches the next step before the number reaches a review deck.

Every one of your stores gets its own baseline. Ward watches fill rate, shrinkage %, fresh waste % against it and brings up only the deviations that hold up. The two that show up most in grocery retail are fresh waste & spoilage and on-shelf availability gaps, and both are baseline problems before they are P&L problems.

The connection to SAP Retail is read-only and runs on your schedule. Ward pulls from POS transactions, inventory positions, and the rest of the feed, then cross-references it with external context your ERP does not carry: weather, local events, competitor pricing.

At the metric level. Ward tracks on-shelf availability, backroom-to-shelf replenishment speed, DC delivery reliability, and intra-day depletion curves. The critical insight is separating supply problems from execution problems, since the fix is completely different.

Signals · POS velocity, on-hand inventory, DC delivery feeds, supplier fill rate scorecards, labor schedules, and (optional) shelf imaging or weight sensors.

Why this combination
is its own problem.

Fill Rate Monitoring needs POS transactions and inventory positions at minimum. SAP Retail carries both, at the grain the model needs. That is the whole integration story: no middleware, no staging warehouse, no custom extract.

  • 01 DSD categories (bread, milk, beer, soda) sit outside the fill rate measurement framework because the vendor owns replenishment.
  • 02 Backroom-full-but-shelf-empty is a labor problem mistaken for a supply problem because both report as out-of-stock.

Benchmarks. Healthy grocery on-shelf availability: 96-98% center store, 92-95% perishable, 88-92% during the closing daypart. Each percentage-point drop on top-100 SKUs ties to roughly 0.3-0.5% category revenue erosion; on milk, eggs, and bread the multiplier is 2-3x because of basket abandonment.

What the first 90 days
actually look like.

  1. 01

    Week 1: connect

    Read-only credentials to SAP Retail. Ward ingests POS transactions, inventory positions, purchase orders and starts building baselines. First findings land inside 48 hours, before baselines are stable, so you can see the shape of the output early.

  2. 02

    Weeks 2 to 3: calibration

    Baselines stabilize per store and per category. Ward stops flagging normal variance and starts flagging exceptions. This is the window where the false positive rate drops sharply.

  3. 03

    Weeks 4 to 12: steady state

    Ward returns cards every morning, each with what caused it and the next step. Volume settles at a level a single person can read over coffee. The measure of success is not how many cards arrive, it is how many get acted on.

How Ward connects to SAP Retail

Ward connects to SAP Retail (S/4HANA, ECC, CAR) via standard BAPIs and IDocs. Transaction data, inventory positions, and master data flow into Ward without custom development.

Setup: Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.

Data Ward reads from SAP

POS transactions
Inventory positions
Purchase orders
Material master
Vendor master
Promotion calendar

Impact metrics with SAP

Replenishment Accuracy
Gaps flagged early
Inventory positions matched to POS velocity before shelf impact.
Shrinkage
Anomalies surfaced continuously
Transaction-level detection catches what periodic audits miss.
Forecast Accuracy
External signals layered
Weather, events, and competitor data sharpen SAP demand signals.
Promo ROI
True lift isolated
Sell-through data exposes cannibalization and halo effects.

Data lake enrichment

Ward enriches SAP data with: POS transactions, Weather & events, Competitor pricing, Loyalty & CRM, Supplier fill rates

You find out about stockouts after customers do.

Pain points
  • ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
  • ×Supplier fill rate problems announce themselves at the receiving dock
  • ×Safety stock levels get set once a year and left alone
  • ×No early warning system for supply chain disruptions
  • ×Replenishment exceptions require manual triage every morning
How Ward helps
  • Stockout prediction cards arrive 24-72 hours before empty shelves
  • Supplier fill rate tracking with automatic escalation
  • Dynamic safety stock recommendations based on current demand signals
  • Weather, event, and macro-driven demand adjustments
  • Replenishment exceptions auto-prioritized by revenue impact

Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group

Grocery KPI impact

Shrinkage
Cause-level attribution
Loss prevention shifts from guesswork to targeted intervention.
Fill Rate
24–72hr head start
Stockout prediction cards arrive before customers notice gaps.
Fresh Waste
Flagged before spoilage
Perishable turn rates monitored by store.
Promo ROI
Net lift, not gross
True lift net of cannibalization and pull-forward.

Frequently asked questions

Ward monitors on-shelf availability across your entire estate and flags stores or categories dropping below threshold. For Grocery retail specifically, Ward monitors 30,000+ SKUs across your stores and delivers automated insight cards with root cause analysis and recommended actions.

Ward tracks Fill rate, Shrinkage %, Fresh waste %, Promo lift, Basket size at the store-category level. Ward tracks expected vs actual on-shelf availability at the store-category level and escalates when fill rate drops below configurable thresholds.

Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule. Data points include: POS transactions, Inventory positions, Purchase orders, Material master, Vendor master, Promotion calendar.

Yes. Ward reads SAP data and combines it with contextual signals (weather, events, demographics) to generate Grocery-specific insight cards. No custom development required.

You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.

Ward delivers daily insight cards covering Fill rate, Shrinkage %, Fresh waste %, tailored for Supply Chain decision-making. Each card includes what changed, why it matters, and what to do next.

Ward tracks on-shelf availability, backroom-to-shelf replenishment speed, DC delivery reliability, and intra-day depletion curves. The critical insight is separating supply problems from execution problems, since the fix is completely different.

Ward's morning fill rate card shows the estate is healthy overall, but flags seven stores below threshold. It attributes root cause for each: late DC deliveries for some (already en route), a supplier fill rate issue on dairy for others, and an afternoon depletion pattern in produce at two stores suggesting insufficient replenishment labor during the mid-shift window. The VP acts on the labor issues and monitors the rest in under five minutes.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what Grocery fill rate problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info