Assortment Planning for Home Improvement, scoped to supply chain
A home VP Supply Chain owns project basket value, seasonal accuracy, long-tail turn. Ward spots the assortment movement in all of them before it compounds.
Assortment Planning on a home store base, scoped to supply chain
Here is assortment planning in plain terms. Ward analyzes sell-through by store cluster to recommend which SKUs to add, drop, or reallocate.
For Home Improvement retailers, that means continuous review 50,000+ SKUs over stores. Project-based purchasing, long-tail SKUs, and seasonal volatility. Ward manages the complexity of 50,000+ SKU environments with ease.
You find out about stockouts after customers do. Ward surfaces the indicators that change a supply chain decision.
How Ward delivers Assortment findings: Ward clusters stores by demographic, traffic, and sales patterns, then measures SKU performance against cluster benchmarks.
The short list
- Store cluster segmentation
- SKU rationalization recommendations
- Whitespace opportunity detection
- Planogram optimization inputs
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled the spring pre-build against the last three seasons and the weather signal for the 22 Southeast stores.
| Signal | Finding |
|---|---|
seasonal_prebuild | Mulch on-hand hit 61% of plan the week temps broke 70°F |
dc_push | DC push started 9 days after the first-warm-week trigger, LY it was 2 |
attach.project | Soil and edging attach fell 18% at stores that gapped on mulch |
Recommend: tie the push trigger to the 10-day forecast instead of the calendar week, pre-position two truckloads at the 8 stores that gapped, and re-set the attach endcap.
seasonal_prebuild…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
epicor_pos_transactions | import | 2m ago |
epicor_special_orders | import | 2m ago |
netsuite_inventory_snapshot | import | 14m ago |
retail_seasonal_prebuild | import | 1h ago |
retail_sku_velocity | import | 1h ago |
retail_pro_account_sales | import | 1h ago |
retail_weather_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
pro-team-read-accounts | permit | Model::"pro_account_sales" |
vendor-blocked | forbid | Model::"labor_*" |
supply-read-orders | permit | Model::"special_orders" |
Why Assortment matters for Home retail
The top 2,000 SKUs generate the bulk of revenue, but the remaining 48,000 are what makes you a project destination. Drop a niche fitting and you lose the entire project basket. Ward identifies which tail SKUs are project-basket anchors worth keeping and which are truly dead weight that should be rationalized.
What Ward has eyes on.
The assortment model runs daily, not on a reporting calendar. It catches the pattern, accounts for what caused it, and attaches a recommended action before the number reaches a review deck.
Ward keeps a running read on 50,000+ SKUs over your stores, at the store-category level rather than the chain roll-up. The metrics under watch include project basket value, seasonal accuracy, long-tail turn. A roll-up hides a single-store problem inside a healthy average, which is how project basket identification stays invisible for a quarter.
At the metric level. Ward tracks long-tail project basket affinity, Pro vs DIY assortment dependency, seasonal SKU activation cycles, and revenue-per-linear-foot by department and planogram section.
Why this combination
is its own problem.
A VP Supply Chain does not need the assortment model explained. They need to know which stores moved, why, and what to do by end of day. Ward writes the finding at that altitude.
- 01 SKU rationalization based on standalone velocity destroys project-basket anchors and drives customers to competitors for the entire job, net assortment economics turn negative.
- 02 Seasonal activation cycles mean a SKU "dead" for 9 months can be critical for 3; chain-wide 90-day velocity cuts kill seasonal anchors prematurely.
Benchmarks. Home improvement long-tail SKUs (the bottom 60-70% of catalog by velocity) typically generate 8-15% of standalone revenue but anchor 25-35% of project basket value. Pro customers depend disproportionately on the tail, losing tail items typically costs 2-4x the standalone revenue impact in Pro retention.
What the first 90 days
actually look like.
-
01
Week 1: read-only connection
Ward pulls from your existing systems on a read-only connection. Nothing is written back. First findings arrive within 48 hours.
-
02
Weeks 2 to 3: calibration
Baselines stabilize per store and per category. Ward stops flagging normal variance and starts flagging exceptions. This is the window where the false positive rate drops sharply.
-
03
Weeks 4 to 12: operating rhythm
Cards arrive daily and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.
You find out about stockouts after customers do.
- ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
- ×Supplier fill rate problems announce themselves at the receiving dock
- ×Safety stock levels get set once a year and left alone
- ×No early warning system for supply chain disruptions
- ×Replenishment exceptions require manual triage every morning
- ✓Stockout prediction cards arrive 24-72 hours before empty shelves
- ✓Supplier fill rate tracking with automatic escalation
- ✓Dynamic safety stock recommendations based on current demand signals
- ✓Weather, event, and macro-driven demand adjustments
- ✓Replenishment exceptions auto-prioritized by revenue impact
Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group
Home KPI impact
Frequently asked questions
Ward analyzes sell-through by store cluster to recommend which SKUs to add, drop, or reallocate. For Home retail specifically, Ward monitors 50,000+ SKUs across your stores and delivers automated insight cards with root cause analysis and recommended actions.
Ward tracks Project basket value, Seasonal accuracy, Long-tail turn, Pro customer share, Attachment rate at the store-category level. Ward clusters stores by demographic, traffic, and sales patterns, then measures SKU performance against cluster benchmarks.
You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.
Ward delivers daily insight cards covering Project basket value, Seasonal accuracy, Long-tail turn, tailored for Supply Chain decision-making. Each card includes what changed, why it matters, and what to do next.
Ward tracks long-tail project basket affinity, Pro vs DIY assortment dependency, seasonal SKU activation cycles, and revenue-per-linear-foot by department and planogram section.
Plumbing carries thousands of SKUs, hundreds with zero sales in 90 days. Ward's project basket analysis reveals that many of those "dead" SKUs appear alongside high-velocity project items, a specialty elbow fitting with minimal standalone sales is still critical to a complete project basket. Deleting it sends the customer to a competitor for the entire job. Ward separates true orphaned SKUs from project-basket anchors and recommends cutting only the former.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what Home assortment problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.