A home Head of Procurement running demand on SAP
Ward reads POS transactions, inventory positions, purchase orders from SAP Retail, monitors demand over 50,000+ home SKUs, and hands you the procurement read daily.
The full picture: home demand, SAP data, Procurement decisions
Here is demand forecasting in plain terms. Ward combines historical patterns, weather data, local events, and economic signals to forecast demand at the store-SKU-day level.
For Home Improvement retailers, that means continuous review 50,000+ SKUs across stores. Project-based purchasing, long-tail SKUs, and seasonal volatility. Ward manages the complexity of 50,000+ SKU environments with ease.
Merchandising wants Ward. You sign the contract. Ward filters to what a Head of Procurement can act on and drops the rest.
Under the hood. Ward builds store-level demand models incorporating seasonality, weather forecasts, promotional calendars, local events, and macroeconomic indicators.
How the connection works. Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.
Capabilities
- Store-SKU-day level precision
- Weather-driven adjustment
- Event and holiday modeling
- Automatic reorder point recalculation
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled the spring pre-build against the last three seasons and the weather signal for the 22 Southeast stores.
| Signal | Finding |
|---|---|
seasonal_prebuild | Mulch on-hand hit 61% of plan the week temps broke 70°F |
dc_push | DC push started 9 days after the first-warm-week trigger, LY it was 2 |
attach.project | Soil and edging attach fell 18% at stores that gapped on mulch |
Recommend: tie the push trigger to the 10-day forecast instead of the calendar week, pre-position two truckloads at the 8 stores that gapped, and re-set the attach endcap.
seasonal_prebuild…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
epicor_pos_transactions | import | 2m ago |
epicor_special_orders | import | 2m ago |
netsuite_inventory_snapshot | import | 14m ago |
retail_seasonal_prebuild | import | 1h ago |
retail_sku_velocity | import | 1h ago |
retail_pro_account_sales | import | 1h ago |
retail_weather_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
pro-team-read-accounts | permit | Model::"pro_account_sales" |
vendor-blocked | forbid | Model::"labor_*" |
supply-read-orders | permit | Model::"special_orders" |
Why Demand matters for Home retail
Home improvement demand is the most weather-dependent in retail, a warm spring can shift seasonal demand forward by weeks across a large chain. Ward integrates 10-day weather forecasts, historical correlations, and housing market indicators to predict demand at a granularity that static seasonal plans can't match.
Why this combination
is its own problem.
Demand Forecasting behaves differently in home retail than it does anywhere else. The fleet shape, the SKU count, and the speed of the category all change what counts as a real signal and what is noise. Ward is tuned to the home version.
- 01 Housing market indicators (permits, sales) are leading signals for project demand but rarely make it into pharmacy or operational forecasting workflows.
- 02 Seasonal calendars are set chain-wide but the actual project-season start varies 4-8 weeks across regions; Northeast deck season is meaningfully later than Southeast.
Benchmarks. Home improvement seasonal forecast accuracy: 22-35% MAPE on weather-sensitive categories (paint, lawn/garden, outdoor power) is healthy. A 5-point accuracy gain typically reduces seasonal markdown by 20-30% and recovers 1-3% category revenue from better stock positioning.
What Ward has eyes on.
Ward monitors 50,000+ SKUs across your stores, at the store-category level rather than the chain roll-up. The metrics under watch include project basket value, seasonal accuracy, long-tail turn. A roll-up hides a single-store problem inside a healthy average, which is how project basket identification stays invisible for a quarter.
Ward ingests POS transactions, inventory positions, purchase orders from SAP Retail on a read-only connection. Nothing is written back, and your ERP configuration does not change. SAP stays the system of record.
See demand before it arrives. Ward runs the model continuously rather than on a reporting cycle, which is why a finding lands the morning the pattern starts instead of at the end of the period.
At the metric level. Ward integrates hyperlocal weather data, housing market indicators (home sales, building permits), seasonal project activation curves, and Pro customer pipeline data. Forecast accuracy is measured by department and weather-sensitivity tier.
What the first 90 days
actually look like.
-
01
Week 1: read-only connection
Ward connects to SAP Retail with read-only credentials and begins ingesting POS transactions and inventory positions. No config changes on your side. First cards arrive in two days.
-
02
Weeks 2 to 3: baselines
Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the cards are directionally right and the thresholds are still moving.
-
03
Weeks 4 to 12: steady state
Ward hands back findings each day, each with the driver and what to do about it. Volume settles at a level a single person can read over coffee. The measure of success is not how many cards arrive, it is how many get acted on.
How Ward connects to SAP Retail
Ward connects to SAP Retail (S/4HANA, ECC, CAR) via standard BAPIs and IDocs. Transaction data, inventory positions, and master data flow into Ward without custom development.
Setup: Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.
Data Ward reads from SAP
Impact metrics with SAP
Data lake enrichment
Ward enriches SAP data with: POS transactions, Weather & events, Competitor pricing, Loyalty & CRM, Supplier fill rates
Merchandising wants Ward. You sign the contract.
- ×Business sponsor saw the demo. You have a week to vet a vendor you didn't pick
- ×AI vendors price by seats and tokens. Total cost is unknowable until invoice three
- ×Multi-year commits with auto-renew. No exit if the pilot stalls
- ×Renewals come back 30% higher, with no room to push back and no benchmark to cite
- ×Security and DPA reviews start after the team has already committed
- ✓MSA, DPA, SOC 2 Type II underway, and architecture review available before signature
- ✓Month-to-month contracts. No multi-year lock-in. No auto-renew traps
- ✓Transparent pricing set by scope and store count
- ✓14-day insight guarantee. If Ward doesn't deliver, month two is on us
- ✓AI strategy, orchestration and reporting-layer work in enterprise grocery at nine-figure revenue. Reference calls available before signature
Enterprise SaaS spend grew 18% YoY. 53% of subscriptions are underused or duplicative. Source: Gartner
Home KPI impact
Frequently asked questions
Ward combines historical patterns, weather data, local events, and economic signals to forecast demand at the store-SKU-day level. For Home retail specifically, Ward monitors 50,000+ SKUs across your stores and delivers automated insight cards with root cause analysis and recommended actions.
Ward tracks Project basket value, Seasonal accuracy, Long-tail turn, Pro customer share, Attachment rate at the store-category level. Ward builds store-level demand models incorporating seasonality, weather forecasts, promotional calendars, local events, and macroeconomic indicators.
Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule. Data points include: POS transactions, Inventory positions, Purchase orders, Material master, Vendor master, Promotion calendar.
Yes. Ward reads SAP data and combines it with contextual signals (weather, events, demographics) to generate Home-specific insight cards. No custom development required.
Merchandising wants Ward. You sign the contract. Ward solves this with automated insight cards: MSA, DPA, SOC 2 Type II underway, and architecture review available before signature. Month-to-month contracts. No multi-year lock-in. No auto-renew traps. Transparent pricing set by scope and store count.
Ward delivers daily insight cards covering Project basket value, Seasonal accuracy, Long-tail turn, tailored for Procurement decision-making. Each card includes what changed, why it matters, and what to do next.
Ward integrates hyperlocal weather data, housing market indicators (home sales, building permits), seasonal project activation curves, and Pro customer pipeline data. Forecast accuracy is measured by department and weather-sensitivity tier.
February temperatures run well above normal across the Midwest. Ward detects early-spring project categories activating weeks ahead of plan while winter products decelerate faster than expected. Ward issues demand adjustment cards for Midwest stores: accelerate spring resets, cut winter closeout buys, and increase DC allocation of seasonal products. Stores that act capture early-season revenue that would have stocked out under the original plan.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what Home demand problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.