Home fill rate from Power BI, briefed to supply chain
A home VP Supply Chain on Power BI should not be hunting for fill rate problems. Ward surfaces them each day.
The full picture: home fill rate, Power BI data, Supply Chain decisions
Home Improvement changes the scale of the problem: 50,000+ SKUs, every one of your stores. Project-based purchasing, long-tail SKUs, and seasonal volatility. Ward manages the complexity of 50,000+ SKU environments with ease.
You find out about stockouts after customers do. Ward filters to what a VP Supply Chain can act on and drops the rest.
What fill rate monitoring does: Ward monitors on-shelf availability across your entire estate and flags stores or categories dropping below threshold.
What Ward does with that: Ward tracks expected vs actual on-shelf availability at the store-category level and escalates when fill rate drops below configurable thresholds.
Getting the data in. Ward connects to the same data sources Power BI uses. Or reads Power BI datasets via REST API. Your reports stay untouched.
Capabilities
- Estate-wide fill rate dashboard
- Threshold-based alerting
- Store-vs-estate benchmarking
- Category-level drill-down
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled the spring pre-build against the last three seasons and the weather signal for the 22 Southeast stores.
| Signal | Finding |
|---|---|
seasonal_prebuild | Mulch on-hand hit 61% of plan the week temps broke 70°F |
dc_push | DC push started 9 days after the first-warm-week trigger, LY it was 2 |
attach.project | Soil and edging attach fell 18% at stores that gapped on mulch |
Recommend: tie the push trigger to the 10-day forecast instead of the calendar week, pre-position two truckloads at the 8 stores that gapped, and re-set the attach endcap.
seasonal_prebuild…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
epicor_pos_transactions | import | 2m ago |
epicor_special_orders | import | 2m ago |
netsuite_inventory_snapshot | import | 14m ago |
retail_seasonal_prebuild | import | 1h ago |
retail_sku_velocity | import | 1h ago |
retail_pro_account_sales | import | 1h ago |
retail_weather_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
pro-team-read-accounts | permit | Model::"pro_account_sales" |
vendor-blocked | forbid | Model::"labor_*" |
supply-read-orders | permit | Model::"special_orders" |
Why Fill Rate matters for Home retail
A store can report 96% fill rate while missing the one fastener that completes every deck project basket. Ward monitors fill rate through a project-basket lens, flagging when project-critical items drop below threshold even if aggregate availability looks healthy.
Why this combination
is its own problem.
A VP Supply Chain in home retail owns numbers that move faster than the reporting cycle that covers them. Project basket value, seasonal accuracy, long-tail turn shift store by store, daily. A monthly pack cannot represent that. You find out about stockouts after customers do.
- 01 Endcap and seasonal positioning is tracked separately from fill rate, but the customer experience is shaped by both, a fully-stocked product hidden in a non-seasonal aisle still functions like a stockout.
- 02 Fill rate measured at the SKU level masks project-basket completion; a deck-project basket that needs 12 SKUs has a much lower complete-basket availability than any individual SKU's availability suggests.
Benchmarks. Home improvement project-basket completion: healthy chains run 88-94% on the top-100 project baskets; below 80% on a top basket cuts category revenue 3-7% over the affected weeks. Pro customer fill rate matters disproportionately, Pros typically defect after 2-3 stockouts on flagged SKUs.
What Ward has eyes on.
Ward watches 50,000+ SKUs over your stores, at the store-category level rather than the chain roll-up. The metrics under watch include project basket value, seasonal accuracy, long-tail turn. A roll-up hides a single-store problem inside a healthy average, which is how project basket identification stays invisible for a quarter.
Ward ingests Power BI rather than replacing it. Power BI REST API datasets, underlying SQL/Azure data, dataflow outputs come across on a read-only connection, get enriched with contextual data, and come back as findings. Your BI is untouched.
Every empty shelf is a lost sale. Ward runs the model continuously rather than on a reporting cycle, which is why a finding lands the morning the pattern starts instead of at the end of the period.
At the metric level. Ward tracks project-basket completion rates, department availability with project-dependency weighting, seasonal merchandise positioning timing, and Pro customer order-fill rates, since Pros expect near-perfect availability and defect immediately on gaps.
What the first 90 days
actually look like.
-
01
Week 1: connect
Read-only credentials to Microsoft Power BI. Ward ingests power BI REST API datasets, underlying SQL/Azure data, dataflow outputs and starts building baselines. First daily cards land inside 48 hours, before baselines are stable, so you can see the shape of the output early.
-
02
Weeks 2 to 3: baselines
Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the daily cards are directionally right and the thresholds are still moving.
-
03
Weeks 4 to 12: operating rhythm
Daily cards arrive daily and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.
How Ward connects to Microsoft Power BI
Ward sits alongside Power BI. Your dashboards visualize. Ward detects and explains what changed. No dashboard login needed for your morning brief.
Setup: Ward connects to the same data sources Power BI uses. Or reads Power BI datasets via REST API. Your reports stay untouched.
Data Ward reads from Power BI
Impact metrics with Power BI
Data lake enrichment
Ward enriches Power BI data with: Power BI datasets, Underlying SQL/Azure data, Weather & events, Demographics, Custom feeds
You find out about stockouts after customers do.
- ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
- ×Supplier fill rate problems announce themselves at the receiving dock
- ×Safety stock levels get set once a year and left alone
- ×No early warning system for supply chain disruptions
- ×Replenishment exceptions require manual triage every morning
- ✓Stockout prediction cards arrive 24-72 hours before empty shelves
- ✓Supplier fill rate tracking with automatic escalation
- ✓Dynamic safety stock recommendations based on current demand signals
- ✓Weather, event, and macro-driven demand adjustments
- ✓Replenishment exceptions auto-prioritized by revenue impact
Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group
Home KPI impact
Frequently asked questions
Ward monitors on-shelf availability across your entire estate and flags stores or categories dropping below threshold. For Home retail specifically, Ward monitors 50,000+ SKUs across your stores and delivers automated insight cards with root cause analysis and recommended actions.
Ward tracks Project basket value, Seasonal accuracy, Long-tail turn, Pro customer share, Attachment rate at the store-category level. Ward tracks expected vs actual on-shelf availability at the store-category level and escalates when fill rate drops below configurable thresholds.
Ward connects to the same data sources Power BI uses. Or reads Power BI datasets via REST API. Your reports stay untouched. Data points include: Power BI REST API datasets, Underlying SQL/Azure data, Dataflow outputs.
Yes. Ward reads Power BI data and combines it with contextual signals (weather, events, demographics) to generate Home-specific insight cards. No custom development required.
You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.
Ward delivers daily insight cards covering Project basket value, Seasonal accuracy, Long-tail turn, tailored for Supply Chain decision-making. Each card includes what changed, why it matters, and what to do next.
Ward tracks project-basket completion rates, department availability with project-dependency weighting, seasonal merchandise positioning timing, and Pro customer order-fill rates, since Pros expect near-perfect availability and defect immediately on gaps.
Estate-wide fill rate looks healthy, but Ward's project-basket analysis shows the "deck build" basket has far lower complete-basket availability because a single specialty fastener is out of stock. A standard fill rate report would bury this item among 50,000 others. Ward surfaces it through basket completion analysis, and the supply chain team expedites the item to restore project-level availability within days.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what Home fill rate problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.