Promos · Snowflake

Run promos straight off Snowflake

Know which promos actually work. Ward runs it directly off your Snowflake feed, read-only, with no changes to your Data Platform.

Promo Effectiveness on Snowflake data

Promo Effectiveness is a card type Ward runs continuously. Ward measures true promotional lift net of cannibalization, pull-forward, and pantry loading.

How Ward returns Promos daily cards: Ward isolates incremental volume from baseline, measures cross-SKU cannibalization, estimates pull-forward effects, and calculates true ROI.

How the connection works. Ward connects via Snowflake SQL API with key-pair authentication. Read-only warehouse. Your data never leaves Snowflake.

What it does

  • Promo ROI scorecards
  • Net lift measurement (not gross)
  • Cannibalization quantification
  • Pull-forward detection
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Promos on Snowflake data, live product demo.

Why this combination
is its own problem.

Most promos projects stall at data access. This one does not, because Snowflake already exposes any table or view in your Snowflake account, cross-database joins, historical data at any depth through an API Ward reads directly.

What Ward has eyes on.

The connection to Snowflake is read-only and runs on your schedule. Ward reads straight from any table or view in your Snowflake account, cross-database joins, and the rest of the feed, then cross-references it with external context your Data Platform does not carry: weather, local events, competitor pricing.

The promos model runs each day, not on a reporting calendar. It picks up the pattern, attributes the cause, and attaches a recommended action before the number reaches a review deck.

What the first 90 days
actually look like.

  1. 01

    Week 1: read-only connection

    Ward sits on top of Snowflake with read-only credentials and begins ingesting any table or view in your Snowflake account and cross-database joins. No config changes on your side. First cards arrive inside the first 48 hours.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the insight cards are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: operating rhythm

    Daily cards arrive every morning and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to Snowflake

Ward queries your Snowflake data warehouse directly. If your retail data lives in Snowflake, Ward reads it without moving or copying anything.

Setup: Ward connects via Snowflake SQL API with key-pair authentication. Read-only warehouse. Your data never leaves Snowflake.

Data Ward reads from Snowflake

Any table or view in your Snowflake account
Cross-database joins
Historical data at any depth

Impact metrics with Snowflake

Time to Insight
Zero-copy, zero-ETL
Queries run against existing warehouse tables directly.
Forecast Accuracy
Enrichment joins added
Weather, events, and demographics joined to Snowflake tables.
Data Utilization
Dormant tables activated
Unused warehouse data brought into cross-domain analysis.
Anomaly Detection Speed
Continuous monitoring
Deviations caught days before scheduled reports surface them.

Data lake enrichment

Ward enriches Snowflake data with: Any Snowflake table, Weather & events, Demographics, Competitor data, Custom feeds

Frequently asked questions

Ward connects via Snowflake SQL API with key-pair authentication. Read-only warehouse. Your data never leaves Snowflake. Data points include: Any table or view in your Snowflake account, Cross-database joins, Historical data at any depth.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what promos problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info