Stockout · Epicor · VP Supply Chain

VP Supply Chain: stockout straight off Epicor

Know before the shelf empties. Ward runs it off Epicor, scoped to what a VP Supply Chain owns.

Stockout Prediction on Epicor, for supply chain

Stockout Prediction is a insight card type Ward runs continuously. Ward detects SKUs trending toward zero-on-hand and alerts your team with replenishment recommendations before customers notice.

You find out about stockouts after customers do. Ward writes the finding at the altitude a VP Supply Chain works at.

The mechanism. Ward analyzes sell-through velocity, current inventory levels, lead times, and supplier reliability to predict stockouts 24-72 hours before they occur.

Getting the data in. Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse.

The short list

  • Automated replenishment recommendations
  • Supplier-aware lead time modeling
  • Priority ranking by revenue impact
  • Reduce lost sales by catching gaps early
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Stockout on Epicor data, live product demo.

What Ward has eyes on.

Know before the shelf empties. Ward runs the model continuously rather than on a reporting cycle, which is why a finding lands the morning the pattern starts instead of at the end of the period.

The connection to Epicor is read-only and runs on your schedule. Ward reads straight from sales orders, inventory, and the rest of the feed, then cross-references it with external context your ERP does not carry: weather, local events, competitor pricing.

Why this combination
is its own problem.

A VP Supply Chain does not need the stockout model explained. They need to know which stores moved, why, and what to do by end of day. Ward writes the finding at that altitude.

What the first 90 days
actually look like.

  1. 01

    Week 1: read-only connection

    Ward reads from Epicor with read-only credentials and begins ingesting sales orders and inventory. No config changes on your side. First findings arrive within 48 hours.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the cards are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: operating rhythm

    Daily cards arrive daily and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to Epicor

Ward integrates with Epicor for home improvement, furniture, and building supply retailers. Inventory, purchasing, production, and sales data power insight cards.

Setup: Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse.

Data Ward reads from Epicor

Sales orders
Inventory
Purchase orders
Customer accounts
Pricing tiers
Vendor performance

Impact metrics with Epicor

Seasonal Accuracy
Pre-buy timing sharpened
Weather and event signals calibrate seasonal positioning.
Project Basket Value
Cross-sell patterns found
Project purchasing sequences reveal attachment opportunities.
Vendor Fill Rate
Degradation caught early
Fill rate drops flagged before shelf impact materializes.
Inventory Carrying Cost
Slow-movers identified
Demand-aligned ordering frees capital tied in dead stock.

Data lake enrichment

Ward enriches Epicor data with: Sales orders, Weather & events, Contractor/Pro data, Competitor pricing, Vendor scorecards

You find out about stockouts after customers do.

Pain points
  • ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
  • ×Supplier fill rate problems announce themselves at the receiving dock
  • ×Safety stock levels get set once a year and left alone
  • ×No early warning system for supply chain disruptions
  • ×Replenishment exceptions require manual triage every morning
How Ward helps
  • Stockout prediction cards arrive 24-72 hours before empty shelves
  • Supplier fill rate tracking with automatic escalation
  • Dynamic safety stock recommendations based on current demand signals
  • Weather, event, and macro-driven demand adjustments
  • Replenishment exceptions auto-prioritized by revenue impact

Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group

Frequently asked questions

Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse. Data points include: Sales orders, Inventory, Purchase orders, Customer accounts, Pricing tiers, Vendor performance.

You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what stockout problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info