Stockout Prediction for Director of Store Operations, read from Microsoft Power BI
Ward pulls from power BI REST API datasets, underlying SQL/Azure data, dataflow outputs from Microsoft Power BI, runs stockout on it, and delivers the store operations read each day.
Stockout Prediction on Power BI, for store operations
Managing 800 stores from a spreadsheet is insane. Ward surfaces the signals that change a store operations decision.
Stockout Prediction. Ward detects SKUs trending toward zero-on-hand and alerts your team with replenishment recommendations before customers notice.
How Ward delivers Stockout cards: Ward analyzes sell-through velocity, current inventory levels, lead times, and supplier reliability to predict stockouts 24-72 hours before they occur.
The connection itself. Ward connects to the same data sources Power BI uses. Or reads Power BI datasets via REST API. Your reports stay untouched.
What it does
- Priority ranking by revenue impact
- Reduce lost sales by catching gaps early
- Automated replenishment recommendations
- Supplier-aware lead time modeling
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.
| Signal | Finding |
|---|---|
labor_efficiency | Rev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak |
inventory.fresh | Fresh fill 83%, backroom replenishment lag at 2–4p |
promo.lift | BOGO crackers cannibalized Brand Y by 28%, net category +6% |
Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.
labor_scheduling…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
sap_pos_transactions | import | 2m ago |
sap_inventory_shrinkage | import | 2m ago |
sap_labor_scheduling | import | 14m ago |
retail_inventory_weekly | import | 1h ago |
retail_google_ads_daily | import | 1h ago |
retail_meta_ads_daily | import | 1h ago |
retail_ga4_website_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
finance-read-shrinkage | permit | Model::"inventory_shrinkage" |
vendor-blocked | forbid | Model::"labor_*" |
region-west-only | permit | Tenant::"acme" |
Why this combination
is its own problem.
Stockout Prediction produces a lot of output that is technically correct and operationally useless to store operations. Ward filters on whether the finding changes a decision a Director Store Ops can actually make.
What Ward has eyes on.
The stockout model runs on a daily cycle, not on a reporting calendar. It catches the pattern, explains the cause, and attaches a recommended action before the number reaches a review deck.
Ward reads straight from power BI REST API datasets, underlying SQL/Azure data, dataflow outputs from Microsoft Power BI on a read-only connection. Nothing is written back, and your BI configuration does not change. Power BI stays the system of record.
What the first 90 days
actually look like.
-
01
Week 1: read-only connection
Ward reads from Microsoft Power BI with read-only credentials and begins ingesting power BI REST API datasets and underlying SQL/Azure data. No config changes on your side. First daily cards arrive inside the first 48 hours.
-
02
Weeks 2 to 3: baselines
Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the insight cards are directionally right and the thresholds are still moving.
-
03
Weeks 4 to 12: steady state
Ward returns insight cards daily, each with the cause and a recommended action. Volume settles at a level a single person can read over coffee. The measure of success is not how many insight cards arrive, it is how many get acted on.
How Ward connects to Microsoft Power BI
Ward sits alongside Power BI. Your dashboards visualize. Ward detects and explains what changed. No dashboard login needed for your morning brief.
Setup: Ward connects to the same data sources Power BI uses. Or reads Power BI datasets via REST API. Your reports stay untouched.
Data Ward reads from Power BI
Impact metrics with Power BI
Data lake enrichment
Ward enriches Power BI data with: Power BI datasets, Underlying SQL/Azure data, Weather & events, Demographics, Custom feeds
Managing 800 stores from a spreadsheet is insane.
- ×Morning check-ins rely on phone calls and email chains
- ×No single view of which stores need attention today
- ×Labor scheduling is disconnected from demand signals
- ×Planogram compliance is checked manually, quarterly
- ×Exception management is reactive and inconsistent
- ✓Morning brief delivered at 06:47 with prioritized action list
- ✓Estate-wide heat map of store performance, updated hourly
- ✓Staffing recommendations correlated with predicted traffic
- ✓Planogram compliance anomalies detected and flagged
- ✓Consistent exception handling with recommended actions
Poor labor allocation and inconsistent execution cost multi-store retailers 3–5% in lost sales. Source: RSR Research
Frequently asked questions
Ward connects to the same data sources Power BI uses. Or reads Power BI datasets via REST API. Your reports stay untouched. Data points include: Power BI REST API datasets, Underlying SQL/Azure data, Dataflow outputs.
Managing 800 stores from a spreadsheet is insane. Ward solves this with automated insight cards: Morning brief delivered at 06:47 with prioritized action list. Estate-wide heat map of store performance, updated hourly. Staffing recommendations correlated with predicted traffic.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what stockout problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.