Run assortment straight off Epicor
Stock what sells. Cut what doesn't. Ward runs it directly off your Epicor feed, read-only, with no changes to your ERP.
How Epicor feeds assortment
Assortment Planning. Ward analyzes sell-through by store cluster to recommend which SKUs to add, drop, or reallocate.
How it runs. Ward clusters stores by demographic, traffic, and sales patterns, then measures SKU performance against cluster benchmarks.
Setup: Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse.
Key capabilities
- Store cluster segmentation
- SKU rationalization recommendations
- Whitespace opportunity detection
- Planogram optimization inputs
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.
| Signal | Finding |
|---|---|
labor_efficiency | Rev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak |
inventory.fresh | Fresh fill 83%, backroom replenishment lag at 2–4p |
promo.lift | BOGO crackers cannibalized Brand Y by 28%, net category +6% |
Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.
labor_scheduling…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
sap_pos_transactions | import | 2m ago |
sap_inventory_shrinkage | import | 2m ago |
sap_labor_scheduling | import | 14m ago |
retail_inventory_weekly | import | 1h ago |
retail_google_ads_daily | import | 1h ago |
retail_meta_ads_daily | import | 1h ago |
retail_ga4_website_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
finance-read-shrinkage | permit | Model::"inventory_shrinkage" |
vendor-blocked | forbid | Model::"labor_*" |
region-west-only | permit | Tenant::"acme" |
What Ward has eyes on.
Ward reads straight from sales orders, inventory, purchase orders from Epicor on a read-only connection. Nothing is written back, and your ERP configuration does not change. Epicor stays the system of record.
The assortment model runs on a daily cycle, not on a reporting calendar. It flags the pattern, accounts for the cause, and attaches a recommended action before the number reaches a review deck.
Why this combination
is its own problem.
Assortment Planning needs sales orders and inventory at minimum. Epicor carries both, at the grain the model needs. That is the whole integration story: no middleware, no staging warehouse, no custom extract.
What the first 90 days
actually look like.
-
01
Week 1: connect
Read-only credentials to Epicor. Ward ingests sales orders, inventory, purchase orders and starts building baselines. First cards land inside 48 hours, before baselines are stable, so you can see the shape of the output early.
-
02
Weeks 2 to 3: calibration
Baselines stabilize per store and per category. Ward stops flagging normal variance and starts flagging exceptions. This is the window where the false positive rate drops sharply.
-
03
Weeks 4 to 12: steady state
Ward delivers findings on a daily cycle, each with root cause and a recommended move. Volume settles at a level a single person can read over coffee. The measure of success is not how many cards arrive, it is how many get acted on.
How Ward connects to Epicor
Ward integrates with Epicor for home improvement, furniture, and building supply retailers. Inventory, purchasing, production, and sales data power insight cards.
Setup: Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse.
Data Ward reads from Epicor
Impact metrics with Epicor
Data lake enrichment
Ward enriches Epicor data with: Sales orders, Weather & events, Contractor/Pro data, Competitor pricing, Vendor scorecards
Frequently asked questions
Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse. Data points include: Sales orders, Inventory, Purchase orders, Customer accounts, Pricing tiers, Vendor performance.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what assortment problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.