Your Epicor feed, read as stockout
Stockout Prediction needs sales orders and inventory. Epicor has both. Ward does the rest.
How Epicor feeds stockout
Here is stockout prediction in plain terms. Ward detects SKUs trending toward zero-on-hand and alerts your team with replenishment recommendations before customers notice.
The mechanism. Ward analyzes sell-through velocity, current inventory levels, lead times, and supplier reliability to predict stockouts 24-72 hours before they occur.
The connection itself. Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse.
What you get
- Priority ranking by revenue impact
- Reduce lost sales by catching gaps early
- Automated replenishment recommendations
- Supplier-aware lead time modeling
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.
| Signal | Finding |
|---|---|
labor_efficiency | Rev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak |
inventory.fresh | Fresh fill 83%, backroom replenishment lag at 2–4p |
promo.lift | BOGO crackers cannibalized Brand Y by 28%, net category +6% |
Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.
labor_scheduling…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
sap_pos_transactions | import | 2m ago |
sap_inventory_shrinkage | import | 2m ago |
sap_labor_scheduling | import | 14m ago |
retail_inventory_weekly | import | 1h ago |
retail_google_ads_daily | import | 1h ago |
retail_meta_ads_daily | import | 1h ago |
retail_ga4_website_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
finance-read-shrinkage | permit | Model::"inventory_shrinkage" |
vendor-blocked | forbid | Model::"labor_*" |
region-west-only | permit | Tenant::"acme" |
What Ward has eyes on.
The connection to Epicor is read-only and runs on your schedule. Ward ingests sales orders, inventory, and the rest of the feed, then combines it with external context your ERP does not carry: weather, local events, competitor pricing.
The stockout model runs every morning, not on a reporting calendar. It detects the pattern, attributes root cause, and attaches the next step before the number reaches a review deck.
Why this combination
is its own problem.
Stockout Prediction needs sales orders and inventory at minimum. Epicor carries both, at the grain the model needs. That is the whole integration story: no middleware, no staging warehouse, no custom extract.
What the first 90 days
actually look like.
-
01
Week 1: connect
Read-only credentials to Epicor. Ward ingests sales orders, inventory, purchase orders and starts building baselines. First insight cards land inside 48 hours, before baselines are stable, so you can see the shape of the output early.
-
02
Weeks 2 to 3: baselines
Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the daily cards are directionally right and the thresholds are still moving.
-
03
Weeks 4 to 12: operating rhythm
Cards arrive every morning and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.
How Ward connects to Epicor
Ward integrates with Epicor for home improvement, furniture, and building supply retailers. Inventory, purchasing, production, and sales data power insight cards.
Setup: Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse.
Data Ward reads from Epicor
Impact metrics with Epicor
Data lake enrichment
Ward enriches Epicor data with: Sales orders, Weather & events, Contractor/Pro data, Competitor pricing, Vendor scorecards
Frequently asked questions
Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse. Data points include: Sales orders, Inventory, Purchase orders, Customer accounts, Pricing tiers, Vendor performance.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what stockout problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.