Demand · SAP · VP Supply Chain

Demand Forecasting for VP / Director of Supply Chain, read from SAP Retail

You find out about stockouts after customers do. Ward flags demand movement in your SAP data and explains what caused it.

Demand Forecasting on SAP, for supply chain

You find out about stockouts after customers do. Ward filters to what a VP Supply Chain can act on and drops the rest.

Demand Forecasting is a insight card type Ward runs continuously. Ward combines historical patterns, weather data, local events, and economic signals to forecast demand at the store-SKU-day level.

What Ward does with that: Ward builds store-level demand models incorporating seasonality, weather forecasts, promotional calendars, local events, and macroeconomic indicators.

How the connection works. Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.

What it does

  • Weather-driven adjustment
  • Event and holiday modeling
  • Automatic reorder point recalculation
  • Store-SKU-day level precision
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Demand on SAP data, live product demo.

What Ward has eyes on.

Ward reads SAP rather than replacing it. POS transactions, inventory positions, purchase orders come across on a read-only connection, get enriched with contextual data, and come back as insight cards. Your ERP is untouched.

See demand before it arrives. Ward runs the model continuously rather than on a reporting cycle, which is why a finding lands the morning the pattern starts instead of at the end of the period.

Why this combination
is its own problem.

A VP Supply Chain does not need the demand model explained. They need to know which stores moved, why, and what to do by end of day. Ward writes the finding at that altitude.

What the first 90 days
actually look like.

  1. 01

    Week 1: read-only connection

    Ward sits on top of SAP Retail with read-only credentials and begins ingesting POS transactions and inventory positions. No config changes on your side. First daily cards arrive in two days.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the insight cards are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: operating rhythm

    Insight cards arrive each day and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to SAP Retail

Ward connects to SAP Retail (S/4HANA, ECC, CAR) via standard BAPIs and IDocs. Transaction data, inventory positions, and master data flow into Ward without custom development.

Setup: Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule.

Data Ward reads from SAP

POS transactions
Inventory positions
Purchase orders
Material master
Vendor master
Promotion calendar

Impact metrics with SAP

Replenishment Accuracy
Gaps flagged early
Inventory positions matched to POS velocity before shelf impact.
Shrinkage
Anomalies surfaced continuously
Transaction-level detection catches what periodic audits miss.
Forecast Accuracy
External signals layered
Weather, events, and competitor data sharpen SAP demand signals.
Promo ROI
True lift isolated
Sell-through data exposes cannibalization and halo effects.

Data lake enrichment

Ward enriches SAP data with: POS transactions, Weather & events, Competitor pricing, Loyalty & CRM, Supplier fill rates

You find out about stockouts after customers do.

Pain points
  • ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
  • ×Supplier fill rate problems announce themselves at the receiving dock
  • ×Safety stock levels get set once a year and left alone
  • ×No early warning system for supply chain disruptions
  • ×Replenishment exceptions require manual triage every morning
How Ward helps
  • Stockout prediction cards arrive 24-72 hours before empty shelves
  • Supplier fill rate tracking with automatic escalation
  • Dynamic safety stock recommendations based on current demand signals
  • Weather, event, and macro-driven demand adjustments
  • Replenishment exceptions auto-prioritized by revenue impact

Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group

Frequently asked questions

Ward reads from SAP via RFC/BAPI or OData APIs. No changes to your SAP configuration. Read-only access. Data syncs on your schedule. Data points include: POS transactions, Inventory positions, Purchase orders, Material master, Vendor master, Promotion calendar.

You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what demand problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info