Demand · RELEX · VP Supply Chain

Demand Forecasting on RELEX, for supply chain

Ward reads straight from demand forecasts, space plans, workforce forecasts from RELEX Solutions, runs demand on it, and hands back the supply chain read each day.

How a VP Supply Chain runs demand off RELEX Solutions

You find out about stockouts after customers do. Ward writes the finding at the altitude a VP Supply Chain works at.

Here is demand forecasting in plain terms. Ward combines historical patterns, weather data, local events, and economic signals to forecast demand at the store-SKU-day level.

The mechanism. Ward builds store-level demand models incorporating seasonality, weather forecasts, promotional calendars, local events, and macroeconomic indicators.

The connection itself. Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound.

The short list

  • Automatic reorder point recalculation
  • Store-SKU-day level precision
  • Weather-driven adjustment
  • Event and holiday modeling
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Demand on RELEX data, live product demo.

What Ward has eyes on.

See demand before it arrives. Ward runs the model continuously rather than on a reporting cycle, which is why a finding lands the morning the pattern starts instead of at the end of the period.

The connection to RELEX Solutions is read-only and runs on your schedule. Ward reads straight from demand forecasts, space plans, and the rest of the feed, then combines it with external context your Supply Chain does not carry: weather, local events, competitor pricing.

Why this combination
is its own problem.

Demand Forecasting produces a lot of output that is technically correct and operationally useless to supply chain. Ward filters on whether the finding changes a decision a VP Supply Chain can actually make.

What the first 90 days
actually look like.

  1. 01

    Week 1: read-only connection

    Ward sits on top of RELEX Solutions with read-only credentials and begins ingesting demand forecasts and space plans. No config changes on your side. First insight cards arrive in two days.

  2. 02

    Weeks 2 to 3: calibration

    Baselines stabilize per store and per category. Ward stops flagging normal variance and starts flagging exceptions. This is the window where the false positive rate drops sharply.

  3. 03

    Weeks 4 to 12: operating rhythm

    Cards arrive each day and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to RELEX Solutions

Ward integrates with RELEX for unified retail planning. Ward monitors RELEX forecasts against actuals and surfaces planning exceptions as insight cards.

Setup: Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound.

Data Ward reads from RELEX

Demand forecasts
Space plans
Workforce forecasts
Promotion plans
Replenishment orders

Impact metrics with RELEX

Forecast Accuracy
Drift flagged per store
Accuracy decay caught before it compounds across locations.
Space Productivity
Planogram gaps exposed
Space plans checked against actual sell-through per fixture.
Replenishment Efficiency
Manual triage reduced
Exceptions ranked by revenue impact and urgency.
Fresh Waste
Perishable ordering tightened
Hyperlocal weather and events sharpen fresh item forecasts.

Data lake enrichment

Ward enriches RELEX data with: RELEX forecasts, POS actuals, Weather & events, Demographic data, Supplier performance

You find out about stockouts after customers do.

Pain points
  • ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
  • ×Supplier fill rate problems announce themselves at the receiving dock
  • ×Safety stock levels get set once a year and left alone
  • ×No early warning system for supply chain disruptions
  • ×Replenishment exceptions require manual triage every morning
How Ward helps
  • Stockout prediction cards arrive 24-72 hours before empty shelves
  • Supplier fill rate tracking with automatic escalation
  • Dynamic safety stock recommendations based on current demand signals
  • Weather, event, and macro-driven demand adjustments
  • Replenishment exceptions auto-prioritized by revenue impact

Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group

Frequently asked questions

Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound. Data points include: Demand forecasts, Space plans, Workforce forecasts, Promotion plans, Replenishment orders.

You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what demand problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info