Grocery · Stockout · BigQuery · Head of Procurement

Grocery stockout from BigQuery, briefed to procurement

A grocery Head of Procurement on BigQuery should not be hunting for stockout problems. Ward brings up them every morning.

The full picture: grocery stockout, BigQuery data, Procurement decisions

A Grocery & Supermarket operator is watching 30,000+ SKUs throughout stores. Fresh availability, shrinkage, and promo effectiveness across hundreds of stores. Ward monitors perishable turn rates and flags waste before it happens.

Merchandising wants Ward. You sign the contract. Ward filters to what a Head of Procurement can act on and drops the rest.

Stockout Prediction is a finding type Ward runs continuously. Ward detects SKUs trending toward zero-on-hand and alerts your team with replenishment recommendations before customers notice.

How Ward hands you Stockout daily cards: Ward analyzes sell-through velocity, current inventory levels, lead times, and supplier reliability to predict stockouts 24-72 hours before they occur.

The connection itself. Service account with BigQuery Data Viewer role. Ward runs read-only SQL queries on your schedule.

What it does

  • Automated replenishment recommendations
  • Supplier-aware lead time modeling
  • Priority ranking by revenue impact
  • Reduce lost sales by catching gaps early
app.getward.ai Live demo
Acme Grocery @Merchandising: Fresh Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin, center store
22.6%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
relex_replenishment_planimport1h ago
blue_yonder_forecast_dailyimport1h ago
retail_fresh_waste_dailyimport1h ago
retail_promo_calendarimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
lp-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
fresh-team-westpermitModel::"fresh_waste_daily"
Stockout for Grocery on BigQuery data, live product demo.

Why Stockout matters for Grocery retail

Grocery stockouts train customers to switch stores, not brands, and perishable supply chains leave almost no margin for error. Ward models sell-through velocity at the store-SKU-hour level, factoring in day-of-week seasonality, weather, and supplier lead-time variability to flag gaps before they materialize.

Why this combination
is its own problem.

Stockout Prediction needs any BigQuery dataset and gA4 event exports at minimum. Google BigQuery carries both, at the grain the model needs. That is the whole integration story: no middleware, no staging warehouse, no custom extract.

  • 01 Flat case-pack sizing across stores ignores 5x velocity differences between urban flagships and suburban locations.
  • 02 DSD vendors operate outside the WMS, so milk and bread stockouts never show up in the daily exception report.

Benchmarks. Healthy grocery on-shelf availability runs 95-98% by department, with fresh dipping to 88-92% in the closing daypart. A single percentage point drop on top-50 SKUs typically maps to 0.3-0.5% revenue erosion; the same drop on milk or eggs is closer to 0.8% because basket abandonment compounds.

What Ward has eyes on.

Coverage is store by store, category by category. Ward scans continuously fill rate, shrinkage %, fresh waste % throughout 30,000+ SKUs and compares each store against its own baseline, not against the chain. That is the difference between knowing the fleet is fine and knowing which seven stores are not.

Ward reads straight from any BigQuery dataset, gA4 event exports, ads data transfers from Google BigQuery on a read-only connection. Nothing is written back, and your Data Platform configuration does not change. BigQuery stays the system of record.

Know before the shelf empties. Ward runs the model continuously rather than on a reporting cycle, which is why a finding lands the morning the pattern starts instead of at the end of the period.

At the metric level. Critical metrics: sell-through velocity by daypart, DC-to-store lead time variance, supplier OTIF rates, and substitution elasticity. Ward tracks all four because a replenishment overreaction creates waste that compounds the original stockout cost.

Signals · POS line items, current on-hand by store-SKU, open POs, DSD receipts, supplier lead time history, weather forecasts, local event calendars, and historical lift factors by store cluster.

What the first 90 days
actually look like.

  1. 01

    Week 1: connect

    Read-only credentials to Google BigQuery. Ward ingests any BigQuery dataset, gA4 event exports, ads data transfers and starts building baselines. First daily cards land inside 48 hours, before baselines are stable, so you can see the shape of the output early.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the insight cards are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: steady state

    Ward delivers cards each day, each with what caused it and the next step. Volume settles at a level a single person can read over coffee. The measure of success is not how many findings arrive, it is how many get acted on.

How Ward connects to Google BigQuery

Ward queries BigQuery using your existing datasets. GA4 exports, POS data, CRM exports. Ward reads it where it lives.

Setup: Service account with BigQuery Data Viewer role. Ward runs read-only SQL queries on your schedule.

Data Ward reads from BigQuery

Any BigQuery dataset
GA4 event exports
Ads data transfers
Custom ETL outputs

Impact metrics with BigQuery

Time to Insight
No staging required
GA4, POS, and CRM datasets queried in place.
Marketing Attribution
Online-offline linked
GA4 events joined with in-store POS to close attribution gaps.
Data Activation
Historical data made queryable
Years of unqueried BigQuery data brought into analysis.
Anomaly Detection Speed
Always-on monitoring
Deviations caught between scheduled dashboard reviews.

Data lake enrichment

Ward enriches BigQuery data with: Any BigQuery dataset, GA4 event exports, Weather & events, Demographics, Custom feeds

Merchandising wants Ward. You sign the contract.

Pain points
  • ×Business sponsor saw the demo. You have a week to vet a vendor you didn't pick
  • ×AI vendors price by seats and tokens. Total cost is unknowable until invoice three
  • ×Multi-year commits with auto-renew. No exit if the pilot stalls
  • ×Renewals come back 30% higher, with no room to push back and no benchmark to cite
  • ×Security and DPA reviews start after the team has already committed
How Ward helps
  • MSA, DPA, SOC 2 Type II underway, and architecture review available before signature
  • Month-to-month contracts. No multi-year lock-in. No auto-renew traps
  • Transparent pricing set by scope and store count
  • 14-day insight guarantee. If Ward doesn't deliver, month two is on us
  • AI strategy, orchestration and reporting-layer work in enterprise grocery at nine-figure revenue. Reference calls available before signature

Enterprise SaaS spend grew 18% YoY. 53% of subscriptions are underused or duplicative. Source: Gartner

Grocery KPI impact

Shrinkage
Cause-level attribution
Loss prevention shifts from guesswork to targeted intervention.
Fill Rate
24–72hr head start
Stockout prediction cards arrive before customers notice gaps.
Fresh Waste
Flagged before spoilage
Perishable turn rates monitored by store.
Promo ROI
Net lift, not gross
True lift net of cannibalization and pull-forward.

Frequently asked questions

Ward detects SKUs trending toward zero-on-hand and alerts your team with replenishment recommendations before customers notice. For Grocery retail specifically, Ward monitors 30,000+ SKUs across your stores and delivers automated insight cards with root cause analysis and recommended actions.

Ward tracks Fill rate, Shrinkage %, Fresh waste %, Promo lift, Basket size at the store-category level. Ward analyzes sell-through velocity, current inventory levels, lead times, and supplier reliability to predict stockouts 24-72 hours before they occur.

Service account with BigQuery Data Viewer role. Ward runs read-only SQL queries on your schedule. Data points include: Any BigQuery dataset, GA4 event exports, Ads data transfers, Custom ETL outputs.

Yes. Ward reads BigQuery data and combines it with contextual signals (weather, events, demographics) to generate Grocery-specific insight cards. No custom development required.

Merchandising wants Ward. You sign the contract. Ward solves this with automated insight cards: MSA, DPA, SOC 2 Type II underway, and architecture review available before signature. Month-to-month contracts. No multi-year lock-in. No auto-renew traps. Transparent pricing set by scope and store count.

Ward delivers daily insight cards covering Fill rate, Shrinkage %, Fresh waste %, tailored for Procurement decision-making. Each card includes what changed, why it matters, and what to do next.

Critical metrics: sell-through velocity by daypart, DC-to-store lead time variance, supplier OTIF rates, and substitution elasticity. Ward tracks all four because a replenishment overreaction creates waste that compounds the original stockout cost.

Ward detects organic whole milk selling well above forecast across 23 Northeast stores as a heat wave spikes smoothie demand. Current DC allocation will leave 14 stores empty by Saturday. Ward issues a stockout prediction card Thursday afternoon with a recommended emergency PO and store-level reallocation plan, and the buying team acts before the weekend rush.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what Grocery stockout problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info