Grocery · Stockout · Oracle

Stockout Prediction for Grocery & Supermarket on Oracle

Grocery retailers on Oracle run stockout through Ward. 30,000+ SKUs throughout your stores, scans continuously around the clock.

The grocery stockout stack on Oracle Retail

What stockout prediction does: Ward detects SKUs trending toward zero-on-hand and alerts your team with replenishment recommendations before customers notice.

In a Grocery & Supermarket footprint the job is 30,000+ SKUs over stores. Fresh availability, shrinkage, and promo effectiveness across hundreds of stores. Ward monitors perishable turn rates and flags waste before it happens.

Under the hood. Ward analyzes sell-through velocity, current inventory levels, lead times, and supplier reliability to predict stockouts 24-72 hours before they occur.

Getting the data in. Ward reads from Oracle Retail via REST APIs or direct database views. Compatible with Oracle Cloud and on-premise deployments.

Capabilities

  • Priority ranking by revenue impact
  • Reduce lost sales by catching gaps early
  • Automated replenishment recommendations
  • Supplier-aware lead time modeling
app.getward.ai Live demo
Acme Grocery @Merchandising: Fresh Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin, center store
22.6%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
relex_replenishment_planimport1h ago
blue_yonder_forecast_dailyimport1h ago
retail_fresh_waste_dailyimport1h ago
retail_promo_calendarimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
lp-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
fresh-team-westpermitModel::"fresh_waste_daily"
Stockout for Grocery on Oracle data, live product demo.

Why Stockout matters for Grocery retail

Grocery stockouts train customers to switch stores, not brands, and perishable supply chains leave almost no margin for error. Ward models sell-through velocity at the store-SKU-hour level, factoring in day-of-week seasonality, weather, and supplier lead-time variability to flag gaps before they materialize.

What Ward has eyes on.

Know before the shelf empties. Ward runs the model continuously rather than on a reporting cycle, which is why a finding lands the morning the pattern starts instead of at the end of the period.

Every one of your stores gets its own baseline. Ward scans continuously fill rate, shrinkage %, fresh waste % against it and raises only the deviations that hold up. The two that show up most in grocery retail are fresh waste & spoilage and on-shelf availability gaps, and both are baseline problems before they are P&L problems.

Ward pulls from sales audit, inventory positions, allocation from Oracle Retail on a read-only connection. Nothing is written back, and your ERP configuration does not change. Oracle stays the system of record.

At the metric level. Critical metrics: sell-through velocity by daypart, DC-to-store lead time variance, supplier OTIF rates, and substitution elasticity. Ward tracks all four because a replenishment overreaction creates waste that compounds the original stockout cost.

Signals · POS line items, current on-hand by store-SKU, open POs, DSD receipts, supplier lead time history, weather forecasts, local event calendars, and historical lift factors by store cluster.

Why this combination
is its own problem.

Most stockout projects stall at data access. This one does not, because Oracle already exposes sales audit, inventory positions, allocation through an API Ward reads directly.

  • 01 DSD vendors operate outside the WMS, so milk and bread stockouts never show up in the daily exception report.
  • 02 Flat case-pack sizing across stores ignores 5x velocity differences between urban flagships and suburban locations.

Benchmarks. Healthy grocery on-shelf availability runs 95-98% by department, with fresh dipping to 88-92% in the closing daypart. A single percentage point drop on top-50 SKUs typically maps to 0.3-0.5% revenue erosion; the same drop on milk or eggs is closer to 0.8% because basket abandonment compounds.

What the first 90 days
actually look like.

  1. 01

    Week 1: read-only connection

    Ward connects to Oracle Retail with read-only credentials and begins ingesting sales audit and inventory positions. No config changes on your side. First cards arrive within 48 hours.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the findings are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: operating rhythm

    Insight cards arrive daily and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to Oracle Retail

Ward integrates with Oracle Retail Merchandising (RMFCS), Oracle Retail Demand Forecasting, and Oracle Retail Analytics. Full stack visibility.

Setup: Ward reads from Oracle Retail via REST APIs or direct database views. Compatible with Oracle Cloud and on-premise deployments.

Data Ward reads from Oracle

Sales audit
Inventory positions
Allocation
Replenishment
Demand forecasts
Price management

Impact metrics with Oracle

Fill Rate
Allocation gaps caught
Replenishment outputs checked against actual shelf conditions per store.
Demand Forecast Accuracy
Accuracy gap closed
External signals enrich Oracle forecasts where they drift.
Markdown Waste
Slow movers caught early
Triggers shallower markdowns before inventory ages out.
Inventory Carrying Cost
Overstock freed up
Demand-aligned inventory releases locked working capital.

Data lake enrichment

Ward enriches Oracle data with: Sales audit data, Weather & events, Competitor pricing, Demographic data, Supplier scorecards

Grocery KPI impact

Shrinkage
Cause-level attribution
Loss prevention shifts from guesswork to targeted intervention.
Fill Rate
24–72hr head start
Stockout prediction cards arrive before customers notice gaps.
Fresh Waste
Flagged before spoilage
Perishable turn rates monitored by store.
Promo ROI
Net lift, not gross
True lift net of cannibalization and pull-forward.

Frequently asked questions

Ward detects SKUs trending toward zero-on-hand and alerts your team with replenishment recommendations before customers notice. For Grocery retail specifically, Ward monitors 30,000+ SKUs across your stores and delivers automated insight cards with root cause analysis and recommended actions.

Ward tracks Fill rate, Shrinkage %, Fresh waste %, Promo lift, Basket size at the store-category level. Ward analyzes sell-through velocity, current inventory levels, lead times, and supplier reliability to predict stockouts 24-72 hours before they occur.

Ward reads from Oracle Retail via REST APIs or direct database views. Compatible with Oracle Cloud and on-premise deployments. Data points include: Sales audit, Inventory positions, Allocation, Replenishment, Demand forecasts, Price management.

Yes. Ward reads Oracle data and combines it with contextual signals (weather, events, demographics) to generate Grocery-specific insight cards. No custom development required.

Critical metrics: sell-through velocity by daypart, DC-to-store lead time variance, supplier OTIF rates, and substitution elasticity. Ward tracks all four because a replenishment overreaction creates waste that compounds the original stockout cost.

Ward detects organic whole milk selling well above forecast across 23 Northeast stores as a heat wave spikes smoothie demand. Current DC allocation will leave 14 stores empty by Saturday. Ward issues a stockout prediction card Thursday afternoon with a recommended emergency PO and store-level reallocation plan, and the buying team acts before the weekend rush.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what Grocery stockout problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info