What a VP Supply Chain gets out of NCR
Your POS has POS transactions and item-level sales. A VP Supply Chain needs the two-line version. Ward writes it.
Ward and NCR for VP / Director of Supply Chain
You find out about stockouts after customers do. Ward brings up the inputs that change a supply chain decision.
The connection itself. Ward reads NCR transaction data via API or data export. Real-time or batch, depending on your NCR configuration.
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.
| Signal | Finding |
|---|---|
labor_efficiency | Rev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak |
inventory.fresh | Fresh fill 83%, backroom replenishment lag at 2–4p |
promo.lift | BOGO crackers cannibalized Brand Y by 28%, net category +6% |
Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.
labor_scheduling…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
sap_pos_transactions | import | 2m ago |
sap_inventory_shrinkage | import | 2m ago |
sap_labor_scheduling | import | 14m ago |
retail_inventory_weekly | import | 1h ago |
retail_google_ads_daily | import | 1h ago |
retail_meta_ads_daily | import | 1h ago |
retail_ga4_website_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
finance-read-shrinkage | permit | Model::"inventory_shrinkage" |
vendor-blocked | forbid | Model::"labor_*" |
region-west-only | permit | Tenant::"acme" |
What Ward delivers
- Stockout prediction cards arrive 24-72 hours before empty shelves
- Supplier fill rate tracking with automatic escalation
- Dynamic safety stock recommendations based on current demand signals
- Weather, event, and macro-driven demand adjustments
- Replenishment exceptions auto-prioritized by revenue impact
Data Ward reads from NCR
Why this combination
is its own problem.
A VP Supply Chain rarely logs into NCR. They read what someone else pulled out of it, two days later. Ward removes the two days and the someone else.
What Ward has eyes on.
The connection to NCR Voyix is read-only and runs on your schedule. Ward pulls from POS transactions, item-level sales, and the rest of the feed, then stitches together it with external context your POS does not carry: weather, local events, competitor pricing.
What the first 90 days
actually look like.
-
01
Week 1: read-only connection
Ward plugs into NCR Voyix with read-only credentials and begins ingesting POS transactions and item-level sales. No config changes on your side. First cards arrive within 48 hours.
-
02
Weeks 2 to 3: baselines
Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the findings are directionally right and the thresholds are still moving.
-
03
Weeks 4 to 12: steady state
Ward delivers cards daily, each with the driver and the next step. Volume settles at a level a single person can read over coffee. The measure of success is not how many cards arrive, it is how many get acted on.
How Ward connects to NCR Voyix
Ward integrates with NCR Voyix POS and Aloha for convenience and restaurant retail. Transaction-level data powers daypart analysis and impulse optimization.
Setup: Ward reads NCR transaction data via API or data export. Real-time or batch, depending on your NCR configuration.
Data Ward reads from NCR
Impact metrics with NCR
Data lake enrichment
Ward enriches NCR data with: POS transactions, Weather & events, Loyalty data, Competitor proximity, Demographic data
You find out about stockouts after customers do.
- ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
- ×Supplier fill rate problems announce themselves at the receiving dock
- ×Safety stock levels get set once a year and left alone
- ×No early warning system for supply chain disruptions
- ×Replenishment exceptions require manual triage every morning
- ✓Stockout prediction cards arrive 24-72 hours before empty shelves
- ✓Supplier fill rate tracking with automatic escalation
- ✓Dynamic safety stock recommendations based on current demand signals
- ✓Weather, event, and macro-driven demand adjustments
- ✓Replenishment exceptions auto-prioritized by revenue impact
Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group
Frequently asked questions
Ward reads NCR transaction data via API or data export. Real-time or batch, depending on your NCR configuration. Data points include: POS transactions, Item-level sales, Tender data, Daypart summaries, Loyalty data.
You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what your stores are hiding.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.