What a VP Supply Chain gets out of RELEX
Your Supply Chain has demand forecasts and space plans. A VP Supply Chain needs the two-line version. Ward writes it.
RELEX Solutions, read for supply chain
You find out about stockouts after customers do. Ward hands back insight cards scoped to supply chain decision-making.
How the connection works. Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound.
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.
| Signal | Finding |
|---|---|
labor_efficiency | Rev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak |
inventory.fresh | Fresh fill 83%, backroom replenishment lag at 2–4p |
promo.lift | BOGO crackers cannibalized Brand Y by 28%, net category +6% |
Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.
labor_scheduling…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
sap_pos_transactions | import | 2m ago |
sap_inventory_shrinkage | import | 2m ago |
sap_labor_scheduling | import | 14m ago |
retail_inventory_weekly | import | 1h ago |
retail_google_ads_daily | import | 1h ago |
retail_meta_ads_daily | import | 1h ago |
retail_ga4_website_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
finance-read-shrinkage | permit | Model::"inventory_shrinkage" |
vendor-blocked | forbid | Model::"labor_*" |
region-west-only | permit | Tenant::"acme" |
What Ward delivers
- Stockout prediction cards arrive 24-72 hours before empty shelves
- Supplier fill rate tracking with automatic escalation
- Dynamic safety stock recommendations based on current demand signals
- Weather, event, and macro-driven demand adjustments
- Replenishment exceptions auto-prioritized by revenue impact
Data Ward reads from RELEX
Why this combination
is its own problem.
RELEX Solutions was built for transactions, not for supply chain decisions. The data is right there and it is in the wrong shape. Ward reads demand forecasts and space plans and rewrites them as a decision.
What Ward has eyes on.
Ward pulls from demand forecasts, space plans, workforce forecasts from RELEX Solutions on a read-only connection. Nothing is written back, and your Supply Chain configuration does not change. RELEX stays the system of record.
What the first 90 days
actually look like.
-
01
Week 1: connect
Read-only credentials to RELEX Solutions. Ward pulls from demand forecasts, space plans, workforce forecasts and starts building baselines. First cards land inside 48 hours, before baselines are stable, so you can see the shape of the output early.
-
02
Weeks 2 to 3: baselines
Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the daily cards are directionally right and the thresholds are still moving.
-
03
Weeks 4 to 12: operating rhythm
Daily cards arrive each day and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.
How Ward connects to RELEX Solutions
Ward integrates with RELEX for unified retail planning. Ward monitors RELEX forecasts against actuals and surfaces planning exceptions as insight cards.
Setup: Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound.
Data Ward reads from RELEX
Impact metrics with RELEX
Data lake enrichment
Ward enriches RELEX data with: RELEX forecasts, POS actuals, Weather & events, Demographic data, Supplier performance
You find out about stockouts after customers do.
- ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
- ×Supplier fill rate problems announce themselves at the receiving dock
- ×Safety stock levels get set once a year and left alone
- ×No early warning system for supply chain disruptions
- ×Replenishment exceptions require manual triage every morning
- ✓Stockout prediction cards arrive 24-72 hours before empty shelves
- ✓Supplier fill rate tracking with automatic escalation
- ✓Dynamic safety stock recommendations based on current demand signals
- ✓Weather, event, and macro-driven demand adjustments
- ✓Replenishment exceptions auto-prioritized by revenue impact
Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group
Frequently asked questions
Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound. Data points include: Demand forecasts, Space plans, Workforce forecasts, Promotion plans, Replenishment orders.
You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what your stores are hiding.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.