Promos · Blue Yonder · VP Supply Chain

Promo Effectiveness on Blue Yonder, for supply chain

You find out about stockouts after customers do. Ward catches promos movement in your Blue Yonder data and attributes what caused it.

How a VP Supply Chain runs promos off Blue Yonder

Promo Effectiveness, in one sentence. Ward measures true promotional lift net of cannibalization, pull-forward, and pantry loading.

You find out about stockouts after customers do. Ward surfaces the signals that change a supply chain decision.

The mechanism. Ward isolates incremental volume from baseline, measures cross-SKU cannibalization, estimates pull-forward effects, and calculates true ROI.

Setup: Ward reads Blue Yonder outputs via API or flat file export. Compares forecasts against actuals to measure accuracy.

What it does

  • Promo ROI scorecards
  • Net lift measurement (not gross)
  • Cannibalization quantification
  • Pull-forward detection
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Promos on Blue Yonder data, live product demo.

Why this combination
is its own problem.

Promo Effectiveness produces a lot of output that is technically correct and operationally useless to supply chain. Ward filters on whether the finding changes a decision a VP Supply Chain can actually make.

What Ward has eyes on.

The promos model runs each day, not on a reporting calendar. It picks up the pattern, attributes the driver, and attaches a recommended move before the number reaches a review deck.

Ward ingests Blue Yonder rather than replacing it. Demand forecasts, replenishment recommendations, allocation plans come across on a read-only connection, get enriched with contextual data, and come back as daily cards. Your Supply Chain is untouched.

What the first 90 days
actually look like.

  1. 01

    Week 1: read-only connection

    Ward sits on top of Blue Yonder with read-only credentials and begins ingesting demand forecasts and replenishment recommendations. No config changes on your side. First findings arrive in two days.

  2. 02

    Weeks 2 to 3: calibration

    Baselines stabilize per store and per category. Ward stops flagging normal variance and starts flagging exceptions. This is the window where the false positive rate drops sharply.

  3. 03

    Weeks 4 to 12: steady state

    Ward hands back cards every morning, each with the driver and a recommended move. Volume settles at a level a single person can read over coffee. The measure of success is not how many findings arrive, it is how many get acted on.

How Ward connects to Blue Yonder

Ward layers on top of Blue Yonder demand planning and replenishment. Ward watches what Blue Yonder recommends and flags when actual diverges from plan.

Setup: Ward reads Blue Yonder outputs via API or flat file export. Compares forecasts against actuals to measure accuracy.

Data Ward reads from Blue Yonder

Demand forecasts
Replenishment recommendations
Allocation plans
Exception alerts

Impact metrics with Blue Yonder

Forecast Accuracy
Plan vs actual tracked
Forecasts scored against actuals with external signal overlay.
Replenishment Exceptions
Revenue-ranked triage
Exceptions auto-prioritized so high-impact ones work first.
Fill Rate
Allocation drift caught
Plan-to-demand divergence flagged before stockouts form.
Plan vs Actual Variance
Feedback loop tightened
Continuous plan-to-outcome comparison for planning teams.

Data lake enrichment

Ward enriches Blue Yonder data with: Demand forecasts, POS actuals, Weather & events, Supplier fill rates, Competitor data

You find out about stockouts after customers do.

Pain points
  • ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
  • ×Supplier fill rate problems announce themselves at the receiving dock
  • ×Safety stock levels get set once a year and left alone
  • ×No early warning system for supply chain disruptions
  • ×Replenishment exceptions require manual triage every morning
How Ward helps
  • Stockout prediction cards arrive 24-72 hours before empty shelves
  • Supplier fill rate tracking with automatic escalation
  • Dynamic safety stock recommendations based on current demand signals
  • Weather, event, and macro-driven demand adjustments
  • Replenishment exceptions auto-prioritized by revenue impact

Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group

Frequently asked questions

Ward reads Blue Yonder outputs via API or flat file export. Compares forecasts against actuals to measure accuracy. Data points include: Demand forecasts, Replenishment recommendations, Allocation plans, Exception alerts.

You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what promos problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info