Stockout · BigQuery · Head of Procurement

Stockout Prediction on BigQuery, for procurement

Merchandising wants Ward. You sign the contract. Ward flags stockout movement in your BigQuery data and attributes what caused it.

Stockout Prediction on BigQuery, for procurement

Merchandising wants Ward. You sign the contract. Ward filters to what a Head of Procurement can act on and drops the rest.

Stockout Prediction, in one sentence. Ward detects SKUs trending toward zero-on-hand and alerts your team with replenishment recommendations before customers notice.

Under the hood. Ward analyzes sell-through velocity, current inventory levels, lead times, and supplier reliability to predict stockouts 24-72 hours before they occur.

Setup: Service account with BigQuery Data Viewer role. Ward runs read-only SQL queries on your schedule.

Key capabilities

  • Reduce lost sales by catching gaps early
  • Automated replenishment recommendations
  • Supplier-aware lead time modeling
  • Priority ranking by revenue impact
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Stockout on BigQuery data, live product demo.

What Ward has eyes on.

The stockout model runs each day, not on a reporting calendar. It detects the pattern, attributes the driver, and attaches the next step before the number reaches a review deck.

The connection to Google BigQuery is read-only and runs on your schedule. Ward reads straight from any BigQuery dataset, gA4 event exports, and the rest of the feed, then combines it with external context your Data Platform does not carry: weather, local events, competitor pricing.

Why this combination
is its own problem.

A Head of Procurement does not need the stockout model explained. They need to know which stores moved, why, and what to do by end of day. Ward writes the finding at that altitude.

What the first 90 days
actually look like.

  1. 01

    Week 1: connect

    Read-only credentials to Google BigQuery. Ward reads any BigQuery dataset, gA4 event exports, ads data transfers and starts building baselines. First cards land inside 48 hours, before baselines are stable, so you can see the shape of the output early.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the findings are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: operating rhythm

    Insight cards arrive each day and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to Google BigQuery

Ward queries BigQuery using your existing datasets. GA4 exports, POS data, CRM exports. Ward reads it where it lives.

Setup: Service account with BigQuery Data Viewer role. Ward runs read-only SQL queries on your schedule.

Data Ward reads from BigQuery

Any BigQuery dataset
GA4 event exports
Ads data transfers
Custom ETL outputs

Impact metrics with BigQuery

Time to Insight
No staging required
GA4, POS, and CRM datasets queried in place.
Marketing Attribution
Online-offline linked
GA4 events joined with in-store POS to close attribution gaps.
Data Activation
Historical data made queryable
Years of unqueried BigQuery data brought into analysis.
Anomaly Detection Speed
Always-on monitoring
Deviations caught between scheduled dashboard reviews.

Data lake enrichment

Ward enriches BigQuery data with: Any BigQuery dataset, GA4 event exports, Weather & events, Demographics, Custom feeds

Merchandising wants Ward. You sign the contract.

Pain points
  • ×Business sponsor saw the demo. You have a week to vet a vendor you didn't pick
  • ×AI vendors price by seats and tokens. Total cost is unknowable until invoice three
  • ×Multi-year commits with auto-renew. No exit if the pilot stalls
  • ×Renewals come back 30% higher, with no room to push back and no benchmark to cite
  • ×Security and DPA reviews start after the team has already committed
How Ward helps
  • MSA, DPA, SOC 2 Type II underway, and architecture review available before signature
  • Month-to-month contracts. No multi-year lock-in. No auto-renew traps
  • Transparent pricing set by scope and store count
  • 14-day insight guarantee. If Ward doesn't deliver, month two is on us
  • AI strategy, orchestration and reporting-layer work in enterprise grocery at nine-figure revenue. Reference calls available before signature

Enterprise SaaS spend grew 18% YoY. 53% of subscriptions are underused or duplicative. Source: Gartner

Frequently asked questions

Service account with BigQuery Data Viewer role. Ward runs read-only SQL queries on your schedule. Data points include: Any BigQuery dataset, GA4 event exports, Ads data transfers, Custom ETL outputs.

Merchandising wants Ward. You sign the contract. Ward solves this with automated insight cards: MSA, DPA, SOC 2 Type II underway, and architecture review available before signature. Month-to-month contracts. No multi-year lock-in. No auto-renew traps. Transparent pricing set by scope and store count.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what stockout problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info