Blue Yonder plus Ward: demand forecasting
Ward reads straight from demand forecasts, replenishment recommendations, allocation plans from Blue Yonder, then cross-references them with weather, events, and demographics to produce demand cards.
Running demand forecasting off Blue Yonder
Demand Forecasting is a insight card type Ward runs continuously. Ward combines historical patterns, weather data, local events, and economic signals to forecast demand at the store-SKU-day level.
Under the hood. Ward builds store-level demand models incorporating seasonality, weather forecasts, promotional calendars, local events, and macroeconomic indicators.
How the connection works. Ward reads Blue Yonder outputs via API or flat file export. Compares forecasts against actuals to measure accuracy.
What you get
- Automatic reorder point recalculation
- Store-SKU-day level precision
- Weather-driven adjustment
- Event and holiday modeling
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.
| Signal | Finding |
|---|---|
labor_efficiency | Rev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak |
inventory.fresh | Fresh fill 83%, backroom replenishment lag at 2–4p |
promo.lift | BOGO crackers cannibalized Brand Y by 28%, net category +6% |
Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.
labor_scheduling…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
sap_pos_transactions | import | 2m ago |
sap_inventory_shrinkage | import | 2m ago |
sap_labor_scheduling | import | 14m ago |
retail_inventory_weekly | import | 1h ago |
retail_google_ads_daily | import | 1h ago |
retail_meta_ads_daily | import | 1h ago |
retail_ga4_website_daily | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
merch-read-default | permit | Model::* |
finance-read-shrinkage | permit | Model::"inventory_shrinkage" |
vendor-blocked | forbid | Model::"labor_*" |
region-west-only | permit | Tenant::"acme" |
What Ward has eyes on.
The connection to Blue Yonder is read-only and runs on your schedule. Ward ingests demand forecasts, replenishment recommendations, and the rest of the feed, then combines it with external context your Supply Chain does not carry: weather, local events, competitor pricing.
The demand model runs on a daily cycle, not on a reporting calendar. It picks up the pattern, attributes what caused it, and attaches the next step before the number reaches a review deck.
Why this combination
is its own problem.
Most demand projects stall at data access. This one does not, because Blue Yonder already exposes demand forecasts, replenishment recommendations, allocation plans through an API Ward reads directly.
How Ward connects to Blue Yonder
Ward layers on top of Blue Yonder demand planning and replenishment. Ward watches what Blue Yonder recommends and flags when actual diverges from plan.
Setup: Ward reads Blue Yonder outputs via API or flat file export. Compares forecasts against actuals to measure accuracy.
Data Ward reads from Blue Yonder
Impact metrics with Blue Yonder
Data lake enrichment
Ward enriches Blue Yonder data with: Demand forecasts, POS actuals, Weather & events, Supplier fill rates, Competitor data
Frequently asked questions
Ward reads Blue Yonder outputs via API or flat file export. Compares forecasts against actuals to measure accuracy. Data points include: Demand forecasts, Replenishment recommendations, Allocation plans, Exception alerts.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what demand problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.