A furniture Head of IT running demand on Epicor
See demand before it arrives. Ward runs it on Epicor data across your furniture estate, scoped to technology.
Demand Forecasting for Furniture on Epicor, scoped to technology
A Furniture Manufacturing & Retail operator is monitoring 10,000+ SKUs throughout locations. ERP-locked production data, long lead times, and margin erosion you don't see until quarter-end. Ward connects your internal systems and surfaces what matters.
The business wants AI. You sign off on the architecture. Ward writes the finding at the altitude a Head of IT works at.
Demand Forecasting is a insight card type Ward runs continuously. Ward combines historical patterns, weather data, local events, and economic signals to forecast demand at the store-SKU-day level.
How Ward returns Demand daily cards: Ward builds store-level demand models incorporating seasonality, weather forecasts, promotional calendars, local events, and macroeconomic indicators.
The connection itself. Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse.
What you get
- Event and holiday modeling
- Automatic reorder point recalculation
- Store-SKU-day level precision
- Weather-driven adjustment
Chat
Ask anything. Ward routes to the right agent and returns cited answers.
I pulled upholstery cost of goods by BOM line against the last price file. Three quarters of the drop is material and freight, not discounting.
| Signal | Finding |
|---|---|
bom_cost_actuals | Foam and frame stock +9.2% since the March price file, never carried to list |
freight.inbound | Inbound container cost +$412 per unit-equivalent on the Vietnam lane |
channel.mix | Wholesale share up 6pp, and wholesale runs 11pp under DTC margin |
Recommend: reprice the six affected SKUs at the next list cycle, quote the alternate foam vendor, and hold wholesale allocation flat until list catches up.
bom_cost_actuals…
Reporting
Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.
| Model | Horizon | MAPE |
|---|---|---|
holt_winters | 4wk | 4.1% |
arima_sarimax | 13wk | 8.9% |
gbm_demand | 1wk | 2.1% |
bayes_hier | new store | 11.4% |
Sources
Connect external systems to the data lake.
| Name | Type | Last sync |
|---|---|---|
epicor_production_stage_log | import | 2m ago |
epicor_bom_cost_actuals | import | 2m ago |
sap_inventory_snapshot | import | 14m ago |
netsuite_sales_orders | import | 1h ago |
retail_showroom_pos | import | 1h ago |
retail_freight_inbound | import | 1h ago |
retail_dealer_orders | import | 1h ago |
Policies
Browse and manage Cedar access policies for your tenant.
| Policy ID | Effect | Resources |
|---|---|---|
finance-read-default | permit | Model::* |
sourcing-read-bom | permit | Model::"bom_cost_actuals" |
dealer-blocked | forbid | Model::"bom_*" |
plant-read-production | permit | Model::"production_stage_log" |
Why Demand matters for Furniture retail
Configurable furniture breaks standard forecasting. A single sofa model can ship in dozens of fabric, finish, and configuration combinations, and the long lead time means you commit to components before the orders arrive. Ward forecasts at the component and configuration level, so you pre-position the fabrics and frames the mix will actually demand instead of guessing at the parent SKU.
Why this combination
is its own problem.
Most demand projects stall at data access. This one does not, because Epicor already exposes sales orders, inventory, purchase orders through an API Ward reads directly.
- 01 Showroom-discontinued pieces keep generating online demand that the forecast ignores, creating phantom stockouts on the web channel.
- 02 Forecasting at the parent SKU hides that demand is concentrating on a few fabrics and finishes, so the plant builds the wrong mix.
Benchmarks. For configurable furniture, component-level forecasting can cut effective lead time by 20 to 40% by letting plants build common components ahead of order. A 10% improvement in forecast accuracy on a long-lead assortment typically reduces both expedite freight and aged custom inventory materially.
What Ward has eyes on.
Ward pulls from sales orders, inventory, purchase orders from Epicor on a read-only connection. Nothing is written back, and your ERP configuration does not change. Epicor stays the system of record.
The demand model runs every morning, not on a reporting calendar. It picks up the pattern, attributes root cause, and attaches a recommended move before the number reaches a review deck.
Coverage is store by store, category by category. Ward watches inventory carrying cost, order-to-delivery cycle, gross margin by channel over 10,000+ SKUs and compares each store against its own baseline, not against the chain. That is the difference between knowing the footprint is fine and knowing which seven locations are not.
At the metric level. Ward builds demand models at the SKU-configuration and component level, folding in seasonality, catalog and promotional calendars, showroom traffic, and channel mix. Forecasting the components common across configurations lets the plant build ahead safely, which is where long-lead furniture buys most of its speed.
What the first 90 days
actually look like.
-
01
Week 1: read-only connection
Ward reads from Epicor with read-only credentials and begins ingesting sales orders and inventory. No config changes on your side. First insight cards arrive inside the first 48 hours.
-
02
Weeks 2 to 3: calibration
Baselines stabilize per store and per category. Ward stops flagging normal variance and starts flagging exceptions. This is the window where the false positive rate drops sharply.
-
03
Weeks 4 to 12: steady state
Ward returns findings on a daily cycle, each with the cause and a recommended move. Volume settles at a level a single person can read over coffee. The measure of success is not how many cards arrive, it is how many get acted on.
How Ward connects to Epicor
Ward integrates with Epicor for home improvement, furniture, and building supply retailers. Inventory, purchasing, production, and sales data power insight cards.
Setup: Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse.
Data Ward reads from Epicor
Impact metrics with Epicor
Data lake enrichment
Ward enriches Epicor data with: Sales orders, Weather & events, Contractor/Pro data, Competitor pricing, Vendor scorecards
The business wants AI. You sign off on the architecture.
- ×Business sponsor already chose the vendor. You inherit the security review
- ×Every AI vendor wants write access and a copy of the production data
- ×Model lock-in means rewriting the stack when GPT or Claude moves again
- ×Audit trail is an afterthought. Compliance has nothing to pull on
- ×Data lake project keeps getting bumped for the next thing the business wants
- ✓Federated query: data stays in your warehouse. No copies, no shadow lake
- ✓Read-only credentials. Cedar policies enforce least-privilege per agent
- ✓LLM-agnostic. Anthropic, OpenAI, Gemini, Ollama. Bring your own keys
- ✓Every query, every model, every source logged. SIEM-ready audit output
- ✓VPC peering, PrivateLink, SOC 2 II. Your security review is short
74% of enterprise AI projects stall before production. Integration debt and security review are the top two reasons. Source: Gartner
Furniture KPI impact
Frequently asked questions
Ward combines historical patterns, weather data, local events, and economic signals to forecast demand at the store-SKU-day level. For Furniture retail specifically, Ward monitors 10,000+ SKUs across your locations and delivers automated insight cards with root cause analysis and recommended actions.
Ward tracks Inventory carrying cost, Order-to-delivery cycle, Gross margin by channel, Raw material cost variance, Custom order cycle time at the store-category level. Ward builds store-level demand models incorporating seasonality, weather forecasts, promotional calendars, local events, and macroeconomic indicators.
Ward connects via Epicor REST API. Compatible with Epicor Prophet 21 and Epicor Eclipse. Data points include: Sales orders, Inventory, Purchase orders, Customer accounts, Pricing tiers, Vendor performance.
Yes. Ward reads Epicor data and combines it with contextual signals (weather, events, demographics) to generate Furniture-specific insight cards. No custom development required.
The business wants AI. You sign off on the architecture. Ward solves this with automated insight cards: Federated query: data stays in your warehouse. No copies, no shadow lake. Read-only credentials. Cedar policies enforce least-privilege per agent. LLM-agnostic. Anthropic, OpenAI, Gemini, Ollama. Bring your own keys.
Ward delivers daily insight cards covering Inventory carrying cost, Order-to-delivery cycle, Gross margin by channel, tailored for Technology decision-making. Each card includes what changed, why it matters, and what to do next.
Ward builds demand models at the SKU-configuration and component level, folding in seasonality, catalog and promotional calendars, showroom traffic, and channel mix. Forecasting the components common across configurations lets the plant build ahead safely, which is where long-lead furniture buys most of its speed.
A modular seating program sells in 30 fabric and configuration combinations, but the parent-level forecast only tells the plant how many frames to build. Ward forecasts demand at the component grain and shows three fabrics are trending toward 60% of orders while eight others are fading. The card recommends pre-positioning frame and fabric inventory to those combinations. When the custom orders land, the common components are already staged, and average lead time on the program drops by several weeks.
First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.
No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.
Related solutions
See what Furniture demand problems Ward catches.
Root causes, not just alerts. See it on your data.
Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly
Find out what your data has been hiding.
Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.