Grocery · Assortment · Oracle · Head of Procurement

Assortment Planning for Grocery on Oracle, built for procurement

A grocery Head of Procurement on Oracle should not be hunting for assortment problems. Ward pulls forward them daily.

How a grocery Head of Procurement runs assortment on Oracle Retail

Merchandising wants Ward. You sign the contract. Ward hands you daily cards scoped to procurement decision-making.

Here is assortment planning in plain terms. Ward analyzes sell-through by store cluster to recommend which SKUs to add, drop, or reallocate.

Grocery & Supermarket changes the scale of the problem: 30,000+ SKUs, every one of your stores. Fresh availability, shrinkage, and promo effectiveness across hundreds of stores. Ward monitors perishable turn rates and flags waste before it happens.

How Ward delivers Assortment insight cards: Ward clusters stores by demographic, traffic, and sales patterns, then measures SKU performance against cluster benchmarks.

Setup: Ward reads from Oracle Retail via REST APIs or direct database views. Compatible with Oracle Cloud and on-premise deployments.

What it does

  • Whitespace opportunity detection
  • Planogram optimization inputs
  • Store cluster segmentation
  • SKU rationalization recommendations
app.getward.ai Live demo
Acme Grocery @Merchandising: Fresh Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin, center store
22.6%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
relex_replenishment_planimport1h ago
blue_yonder_forecast_dailyimport1h ago
retail_fresh_waste_dailyimport1h ago
retail_promo_calendarimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
lp-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
fresh-team-westpermitModel::"fresh_waste_daily"
Assortment for Grocery on Oracle data, live product demo.

Why Assortment matters for Grocery retail

Every assortment addition displaces something else, so the real question is incremental contribution after cannibalization and basket effects. Ward clusters stores by demographics, traffic, and competitive set, then benchmarks SKU performance at the cluster level to produce assortment recommendations that go beyond national planograms.

Why this combination
is its own problem.

Assortment Planning produces a lot of output that is technically correct and operationally useless to procurement. Ward filters on whether the finding changes a decision a Head of Procurement can actually make.

  • 01 New-item performance gets evaluated against chain averages instead of cluster benchmarks, so winners in one cluster are killed because they fail in another.
  • 02 Slot fees from CPG vendors lock in SKUs that don't earn their facing, Ward exposes the cost-of-inclusion versus actual revenue per linear foot.

Benchmarks. A typical grocery store carries 30,000-45,000 SKUs; the bottom 20% generate under 2% of revenue. Cluster-aware assortment usually frees 5-12% of facings without a revenue drop, which translates to space for 1,500-3,000 better-fit SKUs per store cluster.

What Ward has eyes on.

The assortment model runs on a daily cycle, not on a reporting calendar. It flags the pattern, traces root cause, and attaches a recommended move before the number reaches a review deck.

Coverage is store by store, category by category. Ward watches fill rate, shrinkage %, fresh waste % throughout 30,000+ SKUs and compares each store against its own baseline, not against the chain. That is the difference between knowing the fleet is fine and knowing which seven stores are not.

Ward pulls from sales audit, inventory positions, allocation from Oracle Retail on a read-only connection. Nothing is written back, and your ERP configuration does not change. Oracle stays the system of record.

At the metric level. Ward tracks SKU productivity (revenue per facing), incremental contribution, substitution patterns, and cluster-level demand elasticity, all weighted against supplier fill rates and promotional obligations.

Signals · POS at SKU-store-week, planogram positions, slot fee schedules, supplier promotional commitments, demographic overlays, and competitive proximity data.

What the first 90 days
actually look like.

  1. 01

    Week 1: read-only connection

    Ward sits on top of Oracle Retail with read-only credentials and begins ingesting sales audit and inventory positions. No config changes on your side. First cards arrive in two days.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the daily cards are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: operating rhythm

    Insight cards arrive on a daily cycle and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to Oracle Retail

Ward integrates with Oracle Retail Merchandising (RMFCS), Oracle Retail Demand Forecasting, and Oracle Retail Analytics. Full stack visibility.

Setup: Ward reads from Oracle Retail via REST APIs or direct database views. Compatible with Oracle Cloud and on-premise deployments.

Data Ward reads from Oracle

Sales audit
Inventory positions
Allocation
Replenishment
Demand forecasts
Price management

Impact metrics with Oracle

Fill Rate
Allocation gaps caught
Replenishment outputs checked against actual shelf conditions per store.
Demand Forecast Accuracy
Accuracy gap closed
External signals enrich Oracle forecasts where they drift.
Markdown Waste
Slow movers caught early
Triggers shallower markdowns before inventory ages out.
Inventory Carrying Cost
Overstock freed up
Demand-aligned inventory releases locked working capital.

Data lake enrichment

Ward enriches Oracle data with: Sales audit data, Weather & events, Competitor pricing, Demographic data, Supplier scorecards

Merchandising wants Ward. You sign the contract.

Pain points
  • ×Business sponsor saw the demo. You have a week to vet a vendor you didn't pick
  • ×AI vendors price by seats and tokens. Total cost is unknowable until invoice three
  • ×Multi-year commits with auto-renew. No exit if the pilot stalls
  • ×Renewals come back 30% higher, with no room to push back and no benchmark to cite
  • ×Security and DPA reviews start after the team has already committed
How Ward helps
  • MSA, DPA, SOC 2 Type II underway, and architecture review available before signature
  • Month-to-month contracts. No multi-year lock-in. No auto-renew traps
  • Transparent pricing set by scope and store count
  • 14-day insight guarantee. If Ward doesn't deliver, month two is on us
  • AI strategy, orchestration and reporting-layer work in enterprise grocery at nine-figure revenue. Reference calls available before signature

Enterprise SaaS spend grew 18% YoY. 53% of subscriptions are underused or duplicative. Source: Gartner

Grocery KPI impact

Shrinkage
Cause-level attribution
Loss prevention shifts from guesswork to targeted intervention.
Fill Rate
24–72hr head start
Stockout prediction cards arrive before customers notice gaps.
Fresh Waste
Flagged before spoilage
Perishable turn rates monitored by store.
Promo ROI
Net lift, not gross
True lift net of cannibalization and pull-forward.

Frequently asked questions

Ward analyzes sell-through by store cluster to recommend which SKUs to add, drop, or reallocate. For Grocery retail specifically, Ward monitors 30,000+ SKUs across your stores and delivers automated insight cards with root cause analysis and recommended actions.

Ward tracks Fill rate, Shrinkage %, Fresh waste %, Promo lift, Basket size at the store-category level. Ward clusters stores by demographic, traffic, and sales patterns, then measures SKU performance against cluster benchmarks.

Ward reads from Oracle Retail via REST APIs or direct database views. Compatible with Oracle Cloud and on-premise deployments. Data points include: Sales audit, Inventory positions, Allocation, Replenishment, Demand forecasts, Price management.

Yes. Ward reads Oracle data and combines it with contextual signals (weather, events, demographics) to generate Grocery-specific insight cards. No custom development required.

Merchandising wants Ward. You sign the contract. Ward solves this with automated insight cards: MSA, DPA, SOC 2 Type II underway, and architecture review available before signature. Month-to-month contracts. No multi-year lock-in. No auto-renew traps. Transparent pricing set by scope and store count.

Ward delivers daily insight cards covering Fill rate, Shrinkage %, Fresh waste %, tailored for Procurement decision-making. Each card includes what changed, why it matters, and what to do next.

Ward tracks SKU productivity (revenue per facing), incremental contribution, substitution patterns, and cluster-level demand elasticity, all weighted against supplier fill rates and promotional obligations.

A category manager reviews the natural/organic section across 300 stores. Ward's analysis reveals three distinct clusters: urban health-conscious stores that should carry more SKUs, suburban stores that match the national plan, and rural locations where organic moves at a fraction of the estate average. The one-size-fits-all planogram leaves revenue on the table in urban stores while it ties up slow-moving inventory in rural ones.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what Grocery assortment problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info