Pricing · RELEX · VP Supply Chain

Price Optimization on RELEX, for supply chain

Ward ingests demand forecasts, space plans, workforce forecasts from RELEX Solutions, runs pricing on it, and hands back the supply chain read every morning.

How a VP Supply Chain runs pricing off RELEX Solutions

Price Optimization, in one sentence. Ward monitors price elasticity shifts in real time and recommends adjustments that protect margin without sacrificing volume.

You find out about stockouts after customers do. Ward hands back daily cards scoped to supply chain decision-making.

The mechanism. Ward continuously measures price elasticity by category, tracks competitive pricing signals, and models the margin-volume tradeoff.

The connection itself. Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound.

Capabilities

  • Margin-volume tradeoff modeling
  • Real-time elasticity measurement
  • Category-level price sensitivity
  • Competitive price monitoring
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Pricing on RELEX data, live product demo.

What Ward has eyes on.

The connection to RELEX Solutions is read-only and runs on your schedule. Ward ingests demand forecasts, space plans, and the rest of the feed, then stitches together it with external context your Supply Chain does not carry: weather, local events, competitor pricing.

The pricing model runs every morning, not on a reporting calendar. It catches the pattern, traces the cause, and attaches a recommended move before the number reaches a review deck.

Why this combination
is its own problem.

Price Optimization produces a lot of output that is technically correct and operationally useless to supply chain. Ward filters on whether the finding changes a decision a VP Supply Chain can actually make.

What the first 90 days
actually look like.

  1. 01

    Week 1: connect

    Read-only credentials to RELEX Solutions. Ward reads straight from demand forecasts, space plans, workforce forecasts and starts building baselines. First findings land inside 48 hours, before baselines are stable, so you can see the shape of the output early.

  2. 02

    Weeks 2 to 3: baselines

    Ward needs roughly two weeks of history per store to separate a real deviation from normal variance. During this window the insight cards are directionally right and the thresholds are still moving.

  3. 03

    Weeks 4 to 12: operating rhythm

    Cards arrive every morning and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to RELEX Solutions

Ward integrates with RELEX for unified retail planning. Ward monitors RELEX forecasts against actuals and surfaces planning exceptions as insight cards.

Setup: Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound.

Data Ward reads from RELEX

Demand forecasts
Space plans
Workforce forecasts
Promotion plans
Replenishment orders

Impact metrics with RELEX

Forecast Accuracy
Drift flagged per store
Accuracy decay caught before it compounds across locations.
Space Productivity
Planogram gaps exposed
Space plans checked against actual sell-through per fixture.
Replenishment Efficiency
Manual triage reduced
Exceptions ranked by revenue impact and urgency.
Fresh Waste
Perishable ordering tightened
Hyperlocal weather and events sharpen fresh item forecasts.

Data lake enrichment

Ward enriches RELEX data with: RELEX forecasts, POS actuals, Weather & events, Demographic data, Supplier performance

You find out about stockouts after customers do.

Pain points
  • ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
  • ×Supplier fill rate problems announce themselves at the receiving dock
  • ×Safety stock levels get set once a year and left alone
  • ×No early warning system for supply chain disruptions
  • ×Replenishment exceptions require manual triage every morning
How Ward helps
  • Stockout prediction cards arrive 24-72 hours before empty shelves
  • Supplier fill rate tracking with automatic escalation
  • Dynamic safety stock recommendations based on current demand signals
  • Weather, event, and macro-driven demand adjustments
  • Replenishment exceptions auto-prioritized by revenue impact

Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group

Frequently asked questions

Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound. Data points include: Demand forecasts, Space plans, Workforce forecasts, Promotion plans, Replenishment orders.

You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what pricing problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info