Fill Rate · RELEX · VP Supply Chain

VP Supply Chain: fill rate straight off RELEX

You find out about stockouts after customers do. Ward detects fill rate movement in your RELEX data and accounts for what caused it.

Fill Rate Monitoring on RELEX, for supply chain

You find out about stockouts after customers do. Ward writes the finding at the altitude a VP Supply Chain works at.

Fill Rate Monitoring. Ward monitors on-shelf availability across your entire estate and flags stores or categories dropping below threshold.

What Ward does with that: Ward tracks expected vs actual on-shelf availability at the store-category level and escalates when fill rate drops below configurable thresholds.

Getting the data in. Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound.

What it does

  • Threshold-based alerting
  • Store-vs-estate benchmarking
  • Category-level drill-down
  • Estate-wide fill rate dashboard
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Fill Rate on RELEX data, live product demo.

What Ward has eyes on.

Ward reads straight from RELEX rather than replacing it. Demand forecasts, space plans, workforce forecasts come across on a read-only connection, get enriched with contextual data, and come back as cards. Your Supply Chain is untouched.

The fill rate model runs on a daily cycle, not on a reporting calendar. It spots the pattern, attributes what caused it, and attaches the next step before the number reaches a review deck.

Why this combination
is its own problem.

Fill Rate Monitoring needs demand forecasts and space plans at minimum. RELEX Solutions carries both, at the grain the model needs. That is the whole integration story: no middleware, no staging warehouse, no custom extract.

What the first 90 days
actually look like.

  1. 01

    Week 1: connect

    Read-only credentials to RELEX Solutions. Ward pulls from demand forecasts, space plans, workforce forecasts and starts building baselines. First daily cards land inside 48 hours, before baselines are stable, so you can see the shape of the output early.

  2. 02

    Weeks 2 to 3: calibration

    Baselines stabilize per store and per category. Ward stops flagging normal variance and starts flagging exceptions. This is the window where the false positive rate drops sharply.

  3. 03

    Weeks 4 to 12: operating rhythm

    Findings arrive on a daily cycle and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to RELEX Solutions

Ward integrates with RELEX for unified retail planning. Ward monitors RELEX forecasts against actuals and surfaces planning exceptions as insight cards.

Setup: Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound.

Data Ward reads from RELEX

Demand forecasts
Space plans
Workforce forecasts
Promotion plans
Replenishment orders

Impact metrics with RELEX

Forecast Accuracy
Drift flagged per store
Accuracy decay caught before it compounds across locations.
Space Productivity
Planogram gaps exposed
Space plans checked against actual sell-through per fixture.
Replenishment Efficiency
Manual triage reduced
Exceptions ranked by revenue impact and urgency.
Fresh Waste
Perishable ordering tightened
Hyperlocal weather and events sharpen fresh item forecasts.

Data lake enrichment

Ward enriches RELEX data with: RELEX forecasts, POS actuals, Weather & events, Demographic data, Supplier performance

You find out about stockouts after customers do.

Pain points
  • ×Demand forecasts are off by 15-25% and nobody catches it until the shelf is empty
  • ×Supplier fill rate problems announce themselves at the receiving dock
  • ×Safety stock levels get set once a year and left alone
  • ×No early warning system for supply chain disruptions
  • ×Replenishment exceptions require manual triage every morning
How Ward helps
  • Stockout prediction cards arrive 24-72 hours before empty shelves
  • Supplier fill rate tracking with automatic escalation
  • Dynamic safety stock recommendations based on current demand signals
  • Weather, event, and macro-driven demand adjustments
  • Replenishment exceptions auto-prioritized by revenue impact

Stockouts cost retailers $1.14 trillion in missed sales globally each year. Source: IHL Group

Frequently asked questions

Ward reads RELEX data via API. Monitors forecast accuracy and flags exceptions before they compound. Data points include: Demand forecasts, Space plans, Workforce forecasts, Promotion plans, Replenishment orders.

You find out about stockouts after customers do. Ward solves this with automated insight cards: Stockout prediction cards arrive 24-72 hours before empty shelves. Supplier fill rate tracking with automatic escalation. Dynamic safety stock recommendations based on current demand signals.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what fill rate problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info