Fill Rate · Blue Yonder · Head of IT

Fill Rate Monitoring for Head of IT / VP Technology, read from Blue Yonder

Every empty shelf is a lost sale. Ward runs it off Blue Yonder, scoped to what a Head of IT owns.

How a Head of IT runs fill rate off Blue Yonder

The business wants AI. You sign off on the architecture. Ward hands you insight cards scoped to technology decision-making.

Fill Rate Monitoring. Ward monitors on-shelf availability across your entire estate and flags stores or categories dropping below threshold.

Under the hood. Ward tracks expected vs actual on-shelf availability at the store-category level and escalates when fill rate drops below configurable thresholds.

Getting the data in. Ward reads Blue Yonder outputs via API or flat file export. Compares forecasts against actuals to measure accuracy.

What it does

  • Estate-wide fill rate dashboard
  • Threshold-based alerting
  • Store-vs-estate benchmarking
  • Category-level drill-down
app.getward.ai Live demo
Acme Retail @Merchandising: VP Analyst claude-sonnet default
A

Chat

Ask anything. Ward routes to the right agent and returns cited answers.

Why did Store 37 miss target last week?
You · 9:42 AM
Schema Scout · routed to Merchandising Agent

I pulled Store 37’s last 28 days against the chain baseline. Two root causes, both compounding.

SignalFinding
labor_efficiencyRev/labor-hour −22% vs. cluster, staffing mismatch at 11a–1p peak
inventory.freshFresh fill 83%, backroom replenishment lag at 2–4p
promo.liftBOGO crackers cannibalized Brand Y by 28%, net category +6%

Recommend: re-baseline Store 37 schedule against true peak, raise replen window to 1p, and review the BOGO before next cycle.

8 parallel queries 3 sources cited confidence 0.92
Show me how to fix the staffing mismatch.
You · 9:43 AM
Labor Agent · drafting schedule diff
Querying labor_scheduling
Ask anything, Ward routes to the right agent. Cmd+K

Reporting

Pinned views built from saved data-lake queries. Every number re-derivable from its SQL.

7d13w52w
Revenue vs. forecast
$48.2M
+4.2% WoW
Gross margin %
24.1%
−3.2pp
Fill rate, fresh
83.4%
−4.1pp
Shrink, West region
2.41%
+0.8pp
Revenue vs. forecast 13 weeks actual, 6 weeks forecast, 80% interval
Actual Forecast 80% interval
% of plan 106 94 100 forecast → W−13 W−5 today +6wk
Holt-Winters + weather regressor MAPE 4.1% at 4wk Backtested 24 months Crosses plan in 3 weeks
Forecast error by horizon MAPE, 24-month backtest
1wk 2.1%
2wk 3.0%
4wk 4.1%
8wk 6.3%
13wk 8.9%
Accuracy bar for promo decisions: ≤5% at 4wk
Models in production Every forecast ships a model card
ModelHorizonMAPE
holt_winters4wk4.1%
arima_sarimax13wk8.9%
gbm_demand1wk2.1%
bayes_hiernew store11.4%

Sources

Connect external systems to the data lake.

NameTypeLast sync
sap_pos_transactionsimport2m ago
sap_inventory_shrinkageimport2m ago
sap_labor_schedulingimport14m ago
retail_inventory_weeklyimport1h ago
retail_google_ads_dailyimport1h ago
retail_meta_ads_dailyimport1h ago
retail_ga4_website_dailyimport1h ago

Policies

Browse and manage Cedar access policies for your tenant.

TLS 1.3 AES-256 Read-only SOC 2 II
Policy IDEffectResources
merch-read-defaultpermitModel::*
finance-read-shrinkagepermitModel::"inventory_shrinkage"
vendor-blockedforbidModel::"labor_*"
region-west-onlypermitTenant::"acme"
Fill Rate on Blue Yonder data, live product demo.

Why this combination
is its own problem.

Blue Yonder was built for transactions, not for technology decisions. The data is right there and it is in the wrong shape. Ward pulls from demand forecasts and replenishment recommendations and rewrites them as a decision.

What Ward has eyes on.

Ward ingests demand forecasts, replenishment recommendations, allocation plans from Blue Yonder on a read-only connection. Nothing is written back, and your Supply Chain configuration does not change. Blue Yonder stays the system of record.

The fill rate model runs each day, not on a reporting calendar. It catches the pattern, explains the driver, and attaches a recommended action before the number reaches a review deck.

What the first 90 days
actually look like.

  1. 01

    Week 1: connect

    Read-only credentials to Blue Yonder. Ward pulls from demand forecasts, replenishment recommendations, allocation plans and starts building baselines. First findings land inside 48 hours, before baselines are stable, so you can see the shape of the output early.

  2. 02

    Weeks 2 to 3: calibration

    Baselines stabilize per store and per category. Ward stops flagging normal variance and starts flagging exceptions. This is the window where the false positive rate drops sharply.

  3. 03

    Weeks 4 to 12: operating rhythm

    Cards arrive each day and get triaged like any other queue. Most teams find the volume settles into something one person clears in ten minutes. What matters is the action rate, not the alert count.

How Ward connects to Blue Yonder

Ward layers on top of Blue Yonder demand planning and replenishment. Ward watches what Blue Yonder recommends and flags when actual diverges from plan.

Setup: Ward reads Blue Yonder outputs via API or flat file export. Compares forecasts against actuals to measure accuracy.

Data Ward reads from Blue Yonder

Demand forecasts
Replenishment recommendations
Allocation plans
Exception alerts

Impact metrics with Blue Yonder

Forecast Accuracy
Plan vs actual tracked
Forecasts scored against actuals with external signal overlay.
Replenishment Exceptions
Revenue-ranked triage
Exceptions auto-prioritized so high-impact ones work first.
Fill Rate
Allocation drift caught
Plan-to-demand divergence flagged before stockouts form.
Plan vs Actual Variance
Feedback loop tightened
Continuous plan-to-outcome comparison for planning teams.

Data lake enrichment

Ward enriches Blue Yonder data with: Demand forecasts, POS actuals, Weather & events, Supplier fill rates, Competitor data

The business wants AI. You sign off on the architecture.

Pain points
  • ×Business sponsor already chose the vendor. You inherit the security review
  • ×Every AI vendor wants write access and a copy of the production data
  • ×Model lock-in means rewriting the stack when GPT or Claude moves again
  • ×Audit trail is an afterthought. Compliance has nothing to pull on
  • ×Data lake project keeps getting bumped for the next thing the business wants
How Ward helps
  • Federated query: data stays in your warehouse. No copies, no shadow lake
  • Read-only credentials. Cedar policies enforce least-privilege per agent
  • LLM-agnostic. Anthropic, OpenAI, Gemini, Ollama. Bring your own keys
  • Every query, every model, every source logged. SIEM-ready audit output
  • VPC peering, PrivateLink, SOC 2 II. Your security review is short

74% of enterprise AI projects stall before production. Integration debt and security review are the top two reasons. Source: Gartner

Frequently asked questions

Ward reads Blue Yonder outputs via API or flat file export. Compares forecasts against actuals to measure accuracy. Data points include: Demand forecasts, Replenishment recommendations, Allocation plans, Exception alerts.

The business wants AI. You sign off on the architecture. Ward solves this with automated insight cards: Federated query: data stays in your warehouse. No copies, no shadow lake. Read-only credentials. Cedar policies enforce least-privilege per agent. LLM-agnostic. Anthropic, OpenAI, Gemini, Ollama. Bring your own keys.

First insight cards arrive within 48 hours of data connection. Ward needs approximately 2 weeks to establish stable baselines for your specific operation.

No. Ward sits on top of your existing stack. It is the proactive intelligence layer that watches your data continuously and delivers insight cards, so your team acts on findings instead of hunting for them.

See what fill rate problems Ward catches.

Root causes, not just alerts. See it on your data.

Read-only to start · your LLM keys · SOC 2 Type II underway · or book a call directly

Find out what your data has been hiding.

Tell us about your operation. We’ll show you the problems Ward catches, and the ones your current tools miss.

Step 1 of 3
What are your goals?
Step 2 of 3
About your operation
Step 3 of 3
Your contact info